Originally Posted by
Doug E Style
I don’t know much about 380 ops so can I ask how much of that would be bunk time?
I’m only familiar with LR ops on B744.
A380 777 787 etc. just as fatiguing at 90/100 hrs a month whatever the type, and ops, ie SH out of Lhr.
Not sustainable on a continuous basis, and soon be reduced to regulating your fatigue by sickness etc.