Originally Posted by
LTNman
The short term work is just temporary works so no plans have been published but the retaining wall in front of the control tower is for the temporary rerouting of the road to allow for a cut and cover tunnel to be dug for the Dart rail link. Once the tunnel is built the road will be put back to its present alignment.