Originally Posted by
irishlad06
regarding Jet2.com the plan is for all operating to be within the new terminal for summer 2020. 50% move for summer 19 followed by the remainder in summer 20.
regarding other airlines I am not 100% sure as to who, what and when they are moving.
That is interesting. It would mean a big increase in available check-in space/throughput in T2X compared to T2. The plan is currently to shut the existing T2 (2020-2022) for renovation once the extension opens in 2020. Might this be delayed until after the summer peak, or at least from a check-in point of view, stage the renovations?