PPRuNe Forums - View Single Post - Sid departure calls
View Single Post
Old 15th October 2003 | 18:23
  #2 (permalink)  
tunneler
 
Joined: Mar 2000
Posts: 108
Likes: 0
From: Gatport Airwick
Not got a SID booklet with me but I think i can just about remember the wording.......

"On first contact with London Control a/c must pass Callsign, passing level, cleared level and SID designator"

Perhaps not quite word for word but I'm pretty sure thats the gist of it - think it ensures that atc and the a/c are singing from the same song sheet.
tunneler is offline