As most would know V1 only applies to Cat A/C that require balanced field length Ops. Anything less than that the PIC has to be satisfied that if an eng fails at ANY time during the T/Off sequence that a successful stop or return on one engine can be completed safely. By V1 the decision to stop or go should already be made, V1 is NOT the time to decide what to do!