The connection facility will be improved when it gets a bigger one in T2. The current transfer area was never designed to handle the volume going through it and has a design flaw that leaves the domestic border vulnerable if not managed correctly.
as said, plans are in motion to improve this and will be a much better and more seamless process. As said, the area was never intended for this volume and volumes are increasing much quicker than forecast.