Originally Posted by
LGS6753
In the above quote, the figures in para 3 are roughly 10x the amount in para 4. Are they referring to the same job?
Presumably this relates to the new taxiway parallel to Delta.
The £665,642 is for looking at doing the work by a consultant while the £7.1 cost is for the grafting.