Old 31st Jul 2018, 17:36
  #6 (permalink)  
DaveReidUK
 
Join Date: Jan 2008
Location: Reading, UK
Posts: 10,822
Originally Posted by safetypee View Post
dixi, AFAIR the Trident accident was during a pre-delivery production test flight
Yes, as per the first post:

Originally Posted by Tee Emm View Post
The aircraft took-off from Hatfield at 1652 hours to carry out the first of a series of production test flights for the purpose of qualifying for a Series Certificate of Airworthiness. The schedule for the flight called for stalling tests should the aircraft and the flight conditions be suitable.
That's verbatim from the investigation report.
DaveReidUK is online now