In my first company there was a simulator mission every three months, alternating between training and LPC/OPC. Then they changed it to align with all the other companies in the are to one simulator day of LOFT/Training and a second day of LPC/OPC every six months. And there were plans to do the LPC/OPC on the first day and LOFT/training on the second day which works better with ATQP.