Originally Posted by
Falcon666
I may be in the minority but having seen the options I actually think Opt 2 is the better.
Actually I agree with you. That would give Luton a truly second independent airport sharing the same runway. Luton is a point to point airport so no terminal swapping would be required for connecting passengers. Not that this option would save the park as plan B is the original proposal for a business park so the park would still go.