We are waiting for a dynamic wind input which both SASS and FAST need for accuracy. Also SASS has to be NODELised and technically scrutinised before it can go operational so I believe the time scale is late 2003. Pity really because it is a most desireable piece of kit.
point four
[ 18 August 2001: Message edited by: 120.4 ]