from?
network rail consultation staff present. No material in consultation about funding.
Crossrail/Elizabeth line requires timetable changes to allow access to existing track capacity, threaded between slow stopping services not going to Heathrow. They are using slow tracks only.
Temporary closures not benefitting local and long distance trains, all back on the bus.