Originally Posted by
Dobbo_Dobbo
7 - the size of the terminal extension is actually bigger than first forecast (albeit on a smaller footprint?). The initial plan was a 140% size increase but it is actually 150% larger.
This has likely been achieved using the new mezzanine they say has been added.