Not to fault the controller, but had a second controller been working would the handling controller not feel as rushed leading to a more lengthy conversion and a preserved CVR?
Are inferring that the controller would have discussed preserving the CVR data?
If so, you’re confused as to the role/scope of a controller’s job.