PPRuNe Forums - View Single Post - Bell 505 Jet Ranger X
View Single Post
Old 30th Apr 2018, 14:34
  #647 (permalink)  
toptobottom
 
Join Date: Jan 2003
Location: Near the bottom
Posts: 1,357
Received 1 Like on 1 Post
ASB 05A012

The initial inspection of the main rotor hub per the requirements in this AD must be accomplished by a maintenance engineer. The repetitive inspections per paragraph 2.B.2.a and figure 1 in ASB 05A012 may be accomplished by adding the inspection requirement to the tech log. The repetitive visual inspection may be performed and certified under the provision in Part 43 Appendix A.1 (7) by the holder of a current pilot licence, if that person is rated on the aircraft, appropriately trained and authorised (Part 43, Subpart B refers), and the maintenance is recorded and certified as required by Part 43.
toptobottom is offline