So the trench (see previous post photo), which is being part filled in concrete and that sits next to the Tesco type existing walkway is getting longer by the day and now reaches almost the edge of the taxi rank. Thinking the unthinkable are these actually foundations for a new bespoke covered walkway? In the original artist impressions the fancy walkway roof was supported by a single row of columns.
One advantage of the 5 cul-de-sac drop off lanes is that the lanes don't need pedestrian crossings, which was the curse of the existing design. Will this temporary drop off area only open once the road is diverted over the the new subway?