Originally Posted by
ElZilcho
I believe there was an AD issued, but it came from EASA not the FAA. This reduced the inspection time from 2000 cycles down to 300 for the IPC blades.
Thanks for that. It would be interesting to know why other NAA's haven't seen fit to adopt a similar position.