undocumented procedure
not everything is a procedure. The technique of transitioning the AP into CWS by overiding physically was a technique that utilised the operating design of the system. The problem in my mind, after reading the report, is that line crew didn’t have it in the front of their minds that the operating design of the system had recently changed. More of a communication issue than a training and standards issue in my opinion.