PPRuNe Forums - View Single Post - Overflying a check
View Single Post
Old 2nd March 2018 | 09:44
  #5 (permalink)  
yotty
 
Joined: Apr 2002
Posts: 274
Likes: 3
From: england
From a major UK airline. "Variations of up to 10% for a non
-mandatory task can be authorised by Engineering Quality.

Variations of more than 10% for a non
-mandatory task must be authorised by the CAA.
Authorised Maintrol staff can within authorised limits,
grant a Maintenance Period Time variation to ramp

check, daily/weekly checks and life controlled items.

Any variations outside AMP specified limits, or to
a mandatory requirement, may only be granted by the
CAA.
Variations for other operators aircraft that are ma
intained by XX, must be approved by the operator of
that aircraft."
yotty is offline  
Reply