I see the daa have announced plans to spend an extra €285 between 2019-2021 on minor infrastructure changes in additional to the €100 million p.a spend. Regulator will allow €267.5 to be recovered.
Plans include:
* T1 Immigration Halls Expanded
* T1/T2 Self Service Check In System Expanded
* South Apron Stands
* T2 Bus Lounge
* Docking System & Fixed Ground Power Units in T1
* Major Taxiway Changes to elevate current bottle neck, dual taxi extended, extra line up points and second Runway 10 line up points, improved pier 4 access, future runway and reduce taxi times.