Touch of deja view at Luton as it is the same old story. According to a published schedule work should be underway on the DART as the general program was meant to have stated in October 2017. The enabling work for the tunnel under what is now Taxiway Bravo was also meant to have started at the same time.
To date only the enabling work to shift some fences and a perimeter track has been started and completed. It was the same story with the dual carriageway and the terminal, start dates missed and large overruns of the programme.