•A failure to include £9.6 billion in forecast costs for equipment on top of the £1.3 billion omission related to the Type 31e frigates. This appears to have been caused by a failure by the MoD last year to make politically difficult decisions on which ship, aircraft and vehicle programmes to cut or delay to balance the books.
So £10.9bn slipped down the back of the sofa? How incompetent can you get?