We don’t cycle the flaps, however wait with flap extension until reaching the runway if snow is falling. That is to avoid precipitation on areas not treated as the flaps come out.
Scandinavian operator. We often do several de-ice procedures a day. Not heard of any problems with rehydrated fluids. We log it in the book, so perhaps maintenance has an inspection cycle for it?