Originally Posted by
ara01jbb
I don't recall the exact start date, but this route is longer than most would have realised. I can remember seeing it in the BMI printed timeable circa 2002
Yeah it started in Q4 2002 IIRC.
They also operated NWI-MAN briefly in 2003/4 with the same equipment.
It's a shame to see an operator exit NWI, however I think this particular route canx is due to the state of the UK oil industry more than anything.