At the time of the release of this report, the operator was conducting an engineering examination of the aircraft, in consultation with the aircraft manufacturer, to determine the extent of further damage and the required repair work to be undertaken.
I'm not an engineer so can anyine explain why an assessment of damage etc. on such a small aircraft takes more than two months? Or is the damage and repair significantly extensive?