PPRuNe Forums - View Single Post - Times details proposed UK defence cut options
Old 14th Jan 2018, 11:03
  #44 (permalink)  
The B Word
 
Join Date: Jul 2009
Location: Uranus
Posts: 958
Received 11 Likes on 9 Posts
Originally Posted by reds & greens
The terrible serviceability rates of the E-3D Sentry, coupled to the low availability and flying rates they attain, mean that 2-3 can go. Get rid of Sentinel, which came in as a UOR only, - has that requirement ended? Lose 2 Shadow and put RJ at Mildenhall. Close Waddington (with the exception of the Creech/Drone interlink).
Would also need to find a home for the AWC?

Sentinel was a core programme and not a UOR. Also, the Allies love its product - currently seen as the best out there. Current OSD is 2021.

Mildenhall is due to close and the RJ det to move to Germany.

We’re tied into NATO for AWACS so we either carry on, upgrade it so that a lot of the issues go away, pay lots to join in the NATO AEW&C deal or replace it with something better.

Shadow is growing due to customer demand.

More likely to leave Creech than Waddo. However, keeping footprints on either side of the globe means that 24/7 ops can do extended day shifts each.

Sorry me old, closing Waddo? That would be a bad idea.

The B Word
The B Word is offline