Cryolosophorous
27th Jun 2002, 22:48
Thinking of this as a career move? I have the ear of a woodford know-all…here goes!
1 The last ATCO to leave emigrated to NZ. The SATCO left for Scatsta in January this year. The ATCO before that resigned after management tried (unsuccessfully) to get rid of him. The SATCO before that resigned in disgust due to perceived ill treatment from management. Just 2 ATCOs left.
2 The only departments on site not subcontracted are RFFS, ATC, Tels, and security. Even HR were ousted during the most recent shake-up. TUPE for ATC just around the corner??
3 No traffic of note. Average 4-5 runway movements per day.
4 No shift-pay for the foreseeable future. . Don’t take it for granted at EGCD: it’s a factory with a runway, not an airport.
5 Staff told that there was a guarantee of 6-7 years of work at EGCD. MOD cancelled 3 Nimrod: only 18 now required. There are 4 Nimrod airframes on site with management stating publicly that EGCD has a future if EGCD “performs.” (No civil manufacture after disastrous foray into civil a/c market.) Hmmmmm.. This means that it is possible that EGCD could refurbish the 4 a/c on site then shut the site and re-locate Nimrod, if management calculate that the site is not performing! This is approximately 4 years worth of work. Woodford lost in the region of £200M on the Nimrod contract last year. Strikes did not help the site.
There might be some good news..could it outweigh that lot? Will you get an hour alone with ATC staff? I think not!IGood luck!
:eek:
1 The last ATCO to leave emigrated to NZ. The SATCO left for Scatsta in January this year. The ATCO before that resigned after management tried (unsuccessfully) to get rid of him. The SATCO before that resigned in disgust due to perceived ill treatment from management. Just 2 ATCOs left.
2 The only departments on site not subcontracted are RFFS, ATC, Tels, and security. Even HR were ousted during the most recent shake-up. TUPE for ATC just around the corner??
3 No traffic of note. Average 4-5 runway movements per day.
4 No shift-pay for the foreseeable future. . Don’t take it for granted at EGCD: it’s a factory with a runway, not an airport.
5 Staff told that there was a guarantee of 6-7 years of work at EGCD. MOD cancelled 3 Nimrod: only 18 now required. There are 4 Nimrod airframes on site with management stating publicly that EGCD has a future if EGCD “performs.” (No civil manufacture after disastrous foray into civil a/c market.) Hmmmmm.. This means that it is possible that EGCD could refurbish the 4 a/c on site then shut the site and re-locate Nimrod, if management calculate that the site is not performing! This is approximately 4 years worth of work. Woodford lost in the region of £200M on the Nimrod contract last year. Strikes did not help the site.
There might be some good news..could it outweigh that lot? Will you get an hour alone with ATC staff? I think not!IGood luck!
:eek: