KPax
5th Sep 2005, 17:10
In light of the tragic accident accident that occurred when a helo dropped a large concrete block onto the wires, what if any measures do military rotary operators take when doing tsks similar to this. Are you instructed to avoid built up areas or is direct track, terrain permitting the option. I realise that there are many different things to take into account