The Dominican 9th Dec 2012 14:37

Oh for the love of Christ! Airlines will spend 200 million dollars in an airplane and then ground it by putting off an inspection that requires a few man hours to complete:= have a nice day drama queens:rolleyes:

DaveReidUK 9th Dec 2012 14:44


Airlines will spend 200 million dollars in an airplane and then ground it by putting off an inspection
Except that 787s aren't grounded and airlines aren't putting off inspections. :ugh:

King on a Wing 9th Dec 2012 17:25

It is not an AD issued by Boeing. It is a Safety Directive. And it has to be implemented within one week. Until then the airplanes that do not comply stay on the ground pending repairs.
Needless to say it is a 24 hour job. But the plane WILL BE GROUNDED until it is implemented!
I know of at least 4 major airlines(including AI and QR) who have withdrawn their fleets from commercial ops pending completion of the task.
My 2 million worth..

DaveReidUK 9th Dec 2012 17:41


It is not an AD issued by Boeing. It is a Safety Directive. And it has to be implemented within one week. Until then the airplanes that do not comply stay on the ground pending repairs.
Needless to say it is a 24 hour job. But the plane WILL BE GROUNDED until it is implemented!
That's nonsense.

Either the aircraft is grounded [it isn't] or there is a deadline on compliance with the AD, there wouldn't be any point in doing both.

US-registered 787s subject to the AD can legally fly for 7 days (from the AD effective date of 5th December) before action to ensure that the lockwire installation is correct, and for 21 days before ensuring correct assembly of the engine fuel feed manifold rigid and full flexible couplings.

If operators elect to action the AD before the deadline then that is up to them, but until then they can continue to fly the aircraft if they wish.

Lyman 9th Dec 2012 19:25

If I operated 787s in commercial carriage, and was telexed a mandatory inspection, I would be looking in the document for the time issues, and seriously try to comply. Willful disregard of an AD is bad form.....

The rest is semantics. It's in the DIRECTIVE.

green granite 9th Dec 2012 19:39

Perhaps someone will explain the subtle nuances of the phrase at the end of paragraph G which says:

(g) Inspection

Except as provided by paragraph (h) of this AD: Do the actions specified in paragraphs (g)(1)
and (g)(2) of this AD, in accordance with Action 1) of Boeing Multi Operator Message MOM-MOM-12-0838-01B(R2), including Attachment A, dated November 25, 2012.
(1) Within 7 days after the effective date of this AD, ensure that the lockwire installation on the rigid and full flexible couplings is correct.
(2) Within 21 days after the effective date of this AD, inspect the rigid and full flexible couplings for correct assembly, including replacement of the o-rings with new o-rings, confirmation that the proper retainer rings are installed in the full flexible coupling, a general visual inspection for damage 7
of the blade seals, and all applicable corrective actions. Do all applicable corrective actions before further flight.

And para J:

(j) Special Flight Permit

Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the airplane can be modified, provided the lockwire is correctly installed on the engine fuel feed manifold rigid and full flexible couplings in accordance with paragraph (g)(1) of this AD.

If the Aircraft are not grounded why does it need a special permit to fly?

BOAC 9th Dec 2012 19:40

KoaW - do us all a favour and put us out of our misery please. Highlight the words in the AD that say the a/c is grounded until inspected?

For heavens sake - as andrasz said, where are the mods when you need them?

Even the Seattle times KoaW quotes says
"The safety directive, to be published Wednesday, gives airlines a week to check fuel-line system fastening wires and 21 days to check connectors inside the pylons that hold the engines."

Again, courtesy of Ifix, here is the AD

gg - I am no engineer, but to me that says if you find something wrong, don't fly it until you fix it. The 'special' is to allow a/c that might be going over the 7/21 days at a non-service place to be flown to one where it can be done - otherwise it would be 'grounded'..

This should be in the Spectators Balcony.

green granite 9th Dec 2012 20:07

Thanks BOAC.

BOAC 9th Dec 2012 20:09

As I say, gg - E&OE of course - not an engineer, but I'm sure one will be along shortly!

fantom 9th Dec 2012 20:17

Who cares when you can have an Airbus ?

BOAC 9th Dec 2012 20:26

Fasten your seatbelts, ladies and gentlemen - it could be a bumpy ride to 'Spottersville':)

BBC News - Airbus A380 fleet should be grounded, say engineers

atakacs 9th Dec 2012 20:46


For heavens sake - as andrasz said, where are the mods when you need them?
Probably compiling lists of IPs to be handed over to Ryanair... :(

DaveReidUK 9th Dec 2012 21:52


Perhaps someone will explain the subtle nuances of the phrase at the end of paragraph G which says:

Within 21 days after the effective date of this AD, inspect the rigid and full flexible couplings for correct assembly, including replacement of the o-rings with new o-rings, confirmation that the proper retainer rings are installed in the full flexible coupling, a general visual inspection for damage of the blade seals, and all applicable corrective actions. Do all applicable corrective actions before further flight.
OK, reasonable question, your confusion is understandable.

Think of it as a Catch-22. An operator can wait 21 days, but no longer, before performing that particular inspection and, if necessary, applying any corrective actions. No check within 21 days means the aircraft is then grounded.

But if the check is done sooner, and a fault is found, the operator can't then fly the aircraft for the remainder of the 21 days before carrying out rectification - that must be done before the next flight.

Capn Bloggs 9th Dec 2012 22:20


Originally Posted by Dominican
Airlines will spend 200 million dollars in an airplane and then ground it by putting off an inspection


Originally Posted by Dave Reid
Except that 787s aren't grounded and airlines aren't putting off inspections.

Dominican was posing a rhetorical question, Dave. He wasn't suggesting they actually ground them.

Willoz269 10th Dec 2012 00:33

I wonder if it is more indicative of a problem with Boeing's quality control.

There is a report that the serious fire on the cockpit of an Egiptair 777 was possibly caused because a clamp supporting the first officer's wiring to the mask light panel was missing, not sleeved and a large wiring loop found. Boeing delivered around 280 B777 with this error, which goes against the design.

Now we have the 787 with fuel line connectors not properly installed. Wonder how much all this is costing Boeing?

Romulus 10th Dec 2012 02:40


Originally Posted by airship
I'd question whether or not the "10 work-hours" required can be conducted concurrently (by say using 10 engineers - problem resolved in 1hr)

Sometimes it doesn't work that way. I could see 2 engineers (one per side) completing the check in 5 hours. Just add it to an overnight stop somewhere.

Of course, it may be like pregnancy, no matter how much the key party may desire it to be so there is no opportunity for 9 women to be pregnant 1 month each on her behalf...

Romulus 10th Dec 2012 02:44


Originally Posted by BOAC
Fasten your seatbelts, ladies and gentlemen - it could be a bumpy ride to 'Spottersville'

BBC News - Airbus A380 fleet should be grounded, say engineers

Old news and past history, nothing came of it.

Mr @ Spotty M 10th Dec 2012 04:28

Yes it is all to do with quality control, as all three inspections are from incorrect installation.
The simple answer to your post DaveReidUK is Yes, up until the the inspection you are assuming the installation is correct.
You have to put the parts back together correctly, as Boeing should have done in the first place. :=

DaveReidUK 10th Dec 2012 07:18


Yes, up until the the inspection you are assuming the installation is correct.
Not really.

The only assumption you, as an airline, may implicitly be making is that the FAA's assessment that the aircraft can be flown for another 7/21 days before the inspection is a reasonable one. That doesn't imply any expectation of what the inspection will find.

Or, if the airline disagrees with that assumption, it does the check sooner, if not immediately (though that could equally be done for other reasons ).

lomapaseo 10th Dec 2012 15:27

The assumption in the creation of the Service Bulletin is that you may or may not have a defective aircraft and if you do it may or may not fail in an unsafe manner in a given period of time.

If you exceed that time frame the probability of it failing increases to an unreasonable contribution in average risk compared to all other risks for both known and unknown problems.

There is always the underlying assumption that some un-inspected aircraft are free of the defect and/or that if the defect is present it will not fail and/if it does fail that it will not create an unsafe condition.

note: this kind of logic is way beyond "spectator balcony" stuff and suitable for the Safety forum