PPRuNe Forums - Search Results

Go Back  PPRuNe Forums > Search Forums
Reload this Page >

Search Results

Wikiposts
Search
Search: Posts Made By: Dak Man
Showing results 1 to 8 of 8
Search took 0.03 seconds.
20th Mar 2009, 11:06
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Tanimbar

Nothing untoward.

This table you mentioned seems a bit suspicious to me.

As I've said the engine fuel system is designed to accept fuel (with 260ppm of water present) at the LP inlet down to...
20th Mar 2009, 09:31
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Tanimbar

Fuel systems are routinely Qualification tested with fuel temperatures down to -54°C in the tank and -45°C at the LP inlet. It's fuel in the region of -8°C that is causing the headaches.
20th Mar 2009, 09:11
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Sooty GE90 Architecture

ImageShack - Image Hosting :: ge90dacb777.tif (http://img25.imageshack.us/my.php?image=ge90dacb777.tif)

Indeed Sooty the GE90 does have an interstage LP filter which would go into bypass if...
19th Mar 2009, 19:01
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Perhaps my post was slightly misleading, there is...

Perhaps my post was slightly misleading, there is no hottest or coldest fuel "end", the fuel temp is what it is and is largely uniform as it enters the FCOC, again remember that it's an oil cooler -...
19th Mar 2009, 09:08
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Sooty

This is a normal arrangement, LP Pump - Oil Cooler - LP filter (with bypass) - HP Pump. Nothing unusual in that system and it's comon to all 3 big manufacturers.

Again, where T800 is different is...
18th Mar 2009, 12:14
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

Some clarification. T800 is not likely to...

Some clarification.

T800 is not likely to have a heater matrix bypass installed as part of the FOHE, the modification concerns creating a flush fitting matrix where ice cannot accrete to the...
13th Mar 2009, 14:47
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

If it hadn't been for B777, T800 would have been...

If it hadn't been for B777, T800 would have been cancelled, the SIA order saved it.

Also, BA, traditionally a RR customer specified GE90 for it's initial B777 order. This was unashamedly done as...
13th Mar 2009, 10:43
Replies: 3,239
Views: 1,137,521
Posted By Dak Man

The issue is the amount of protrusion of the...

The issue is the amount of protrusion of the heater matrix tubes above their support plate within the FOHE. These are notoriosly difficult to manufacture and the protrusion height is largely driven...
Showing results 1 to 8 of 8


 
Forum Jump

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.