PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Rumours & News (https://www.pprune.org/rumours-news-13/)
-   -   Boeing notifies FAA that parts in Max and other 737s may be ‘susceptible to premature (https://www.pprune.org/rumours-news/622123-boeing-notifies-faa-parts-max-other-737s-may-susceptible-premature.html)

ion_berkley 4th Jun 2019 04:51

The thread mentioned several times already was:
https://www.pprune.org/rumours-news/...arles-shi.html

Now apparently locked/hidden from view.

Longtimer 16th Jun 2019 14:49


Originally Posted by micis (Post 10485243)
It is on the FAA website: www (dot) faa (dot) gov/news/updates/?newsId=93206

6/2/2019 UpdateFAA Statement

Boeing has informed the FAA that certain 737NG and 737MAX leading edge slat tracks may have been improperly manufactured and may not meet all applicable regulatory requirements for strength and durability.

Following an investigation conducted by Boeing and the FAA Certificate Management Office (CMO), we have determined that up to 148 parts manufactured by a Boeing sub-tier supplier are affected. Boeing has identified groups of both 737NG and 737MAX airplane serial numbers on which these suspect parts may have been installed. 32 NG and 33 MAX are affected in the U.S. Affected worldwide fleet are 133 NG and 179 MAX aircraft.

The affected parts may be susceptible to premature failure or cracks resulting from the improper manufacturing process. Although a complete failure of a leading edge slat track would not result in the loss of the aircraft, a risk remains that a failed part could lead to aircraft damage in fight.

The FAA will issue an Airworthiness Directive to mandate Boeing's service actions to identify and remove the discrepant parts from service. Operators of affected aircraft are required to perform this action within 10 days. The FAA today also alerted international civil aviation authorities of this condition and required actions.

Have yet to find an AD on this problem, yet some reports said one would be issued shortly and that there would be a 10 day time limit for inspection and repair. We are now 14 days and counting for the AD

DaveReidUK 16th Jun 2019 16:48


Originally Posted by Longtimer (Post 10495044)
Have yet to find an AD on this problem, yet some reports said one would be issued shortly and that there would be a 10 day time limit for inspection and repair. We are now 14 days and counting for the AD

AD 2019-11-03

Longtimer 16th Jun 2019 17:33


Originally Posted by DaveReidUK (Post 10495113)

Thank-you.


The AvgasDinosaur 16th Jun 2019 19:18


Originally Posted by ion_berkley (Post 10485975)
The thread mentioned several times already was:
https://www.pprune.org/rumours-news/...arles-shi.html

Now apparently locked/hidden from view.

Why has this previously very informative thread been censored ??
Any mods care to share ?
Be lucky
David


All times are GMT. The time now is 13:00.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.