It's been many years since I was involved in the 777 development, but IIRC, the RAT generator fed the battery bus directly - if they still had the battery bus they would have still had the RAT generator. This should not have happened. Uncle Boeing is going to get more grey hair |
Originally Posted by FullWings
(Post 10342692)
there was enough redundancy/backup in the system to allow the crew to make a successful approach and landing, which is indicative of a very good implementation. |
A lot depends on how far down the probability tails you want to proceed. In almost all FMEAs you get to conditions occur only where several highly improbables occur concurrently in a highly improbable sequence. It gets very difficult to persuade system developers to redesign systems to cope with probabilities in the 10^-15 range.
|
Notable incident of the 777 electrical system: United 777 on the Ground in London 2007 with a complete meltdown of a contactor
https://aviation-safety.net/database...?id=20070226-0 Also this diagram seems interesting: https://cimg1.ibsrv.net/gimg/pprune....1c4bc05838.png |
Do I presume correctly that one IRU must have been powered for one attitude platform to be functional?
|
Originally Posted by Ian W
(Post 10342754)
A lot depends on how far down the probability tails you want to proceed. In almost all FMEAs you get to conditions occur only where several highly improbables occur concurrently in a highly improbable sequence. It gets very difficult to persuade system developers to redesign systems to cope with probabilities in the 10^-15 range.
Therefore, rather than talking mathematics, it would be great to know what failure mitigation worked or, didn't work in this case? |
Still a better design than Airbus were one grenaded engine in the QANTAS A380 took out 55 systems......
|
LATAM B773
I not qualified on 777, but every Boeing I flew the anti-skid was AC powered.... These guys land Hot, Heavy, and no flat tires. Deflated due to heat not having the bottom worn off ;-)) Job well done.
|
Did you see what the debris did to the wiring looms on that A380? This is entirely different - it's one tiny fault that should never, ever, have progressed any further than an EICAS advisory.
I think there will be some concerned engineers at Boeing over Christmas. |
According to the commander, interviewed on TV, power came back after the engines were shut down. Presumably from the APU, on the footage the cabin lights were visible.
|
Originally Posted by tdracer
(Post 10342523)
DeeVee - again, a couple decades since I was involved, but based on what I remember, the only way they could have lost all main bus electrical power (with both engines running) would have been either: latent failures in the electrical bus isolation system (there are regular maintenance checks to confirm such failures are not present), Notable incident of the 777 electrical system: United 777 on the Ground in London 2007 with a complete meltdown of a contactor https://aviation-safety.net/database...?id=20070226-0 AC Power is the "standard", or is prefered, for several systems in commercial air transport aircraft. Don't ask me why, as I don't know the reason ... If a contactor becomes stuck, for whatever reason, and doesn't "let go", to allow another source of AC Power to power the an AC Bus that is without power, then this kind of scenario can happen. Several sources of AC Power available, but none is allowed to supply power to AC Buses that are without power, because the contactor is stuck in position that allows only the Failed source to power the Bus, or it didn't shift completely to allow another source in. AC Power ... we owe that to Tesla |
zerograv,
AC power generation and systems on aircraft are used for reasons of efficiency and weight. DC is needed for systems that require it and, is generally derived from Transformer rectifiers. Of course, the DC battery is usually used as a power source for starting a fully shut-down aircraft and, linked into the DC system, it can act as a limited power source in malfunctions. To back this up, there are usually Inverters to provide AC for certain equipment where/when it is not available from the normal AC Generators. AC power supplies on large aircraft can usually be paralleled and the AC system will normally be operated in parallel. You are correct that "contactors" can have switching or latching failures. In fact, all components can fail. Where faults occur, it may be that a generator cannot be paralleled. These systems on large aircraft are quite complex but offer large resources of failure mitigation, which is why this apparently serious failure is important. Cheers |
These systems on large aircraft are quite complex but offer large resources of failure mitigation, which is why this apparently serious failure is important. Cheers There does appear to be a trend to minimizing the importance of system knowledge in modern training systems. in any case however the crew got to a dark cockpit, they still did a very good job of getting the airplane on the ground with negligible damage. |
Onceapilot
Thanks for that ! To improve my concept of "paralleling", 2 generators can supply power to an AC BUS at same time ? |
AC generators can most definitely share a load, and co-exist on the same "bus" or transmission medium.
The only requirement is that they are in sync, phase and frequency wise. Pretty much exactly the same as how your home Solar Inverter feeds its energy back into the grid. I would hope aircraft generators ran in sync, otherwise switching at an inopportune moment (like when one failed) might lead to smoke and noise...... |
Sorry for what may be a stupid question. I am a mechanical engineer so my EE skills went by eons ago in college and I have only worked with DC circuits on mobile equipment but the electrical grid has tens of thousands of generators powering it, all synced to the same frequency. In the old days they used primitive means to sync but putting a generator on line out of phase can negate the power so they must be synced. Is this not possible on an airplane?
|
The 777 can sync the AC buses when needed. For example, when you shutdown an engine, there is a light delay (250 ms if memory serves) before the fuel shutoff command goes to the engine. ELMS uses this delay to sync the AC bus before the engine spools down and the IDG drops off line (known as a 'breakless transfer'). So if everything is working correctly, on the 777 you don't get that annoying ~50 ms power interrupt when a generator comes on or drops off line that causes the displays to flicker on the 747-400/757/767/
|
Phase lights
My memory is hazy but we synced the generators on the 727 using phase lights. If you rushed the sync you could get a little shudder in the A/C. As part of my expansion of CV during the Arab Oil Emargo, where no flying gig was available, I did a stint in a nuclear/fossil power plant. They told a story of a many ton generator being twisted off mounts when somehow put online out of phase. Off topic sorry. |
Originally Posted by tdracer
(Post 10343366)
The 777 can sync the AC buses when needed.
On the various 747 models, the generators did remain in parallel continuously, each feeding into the four main buses tied together. 747-400 buses will revert to isolated operation for certain autoland configurations requiring isolated and redundant autopilot channels. On 757 and 767, the electrical systems remain isolated. All transfers are break before make, resulting in a short but annoying power interruption. During normal operation, the 747 is the only model where an electrical fault can be 'seen' momentarily by all buses. Until the protection systems act to isolate the faulted section. Because of this parallel operation and the need to identify the location of and isolate a fault, the 747 has perhaps the most complex protection system. The heart of this system is something called differential protection, which can identify where in the system a fault has occurred and open the correct breakers to isolate it. All other models have much simpler (if any) differential protection systems and may trip more breakers than needed upon sensing fault currents passing through. Due to the isolated (at most times) operation of the 777 electrical system, no single fault should affect more than the half of the system (left or right) where it occurs. So this particular incident is troubling. One possible cause is that (for some reason) one of the generator control units failed to transfer load to its generator upon engine start. Leaving the left and right main buses powered from one generator through a bus tie breaker. A subsequent fault, or even an overload condition due to one generator available resulted in the good generator tripping off line. Leaving only standby (battery and RAT) sources to power critical loads. |
Yes, on large alternators that sort of thing can and has happened.
On large diesel sets the most common failure mode from trying to sync out of phase was either to shear the alternator to flywheel coupling bolts or to snap the crankshaft. Fortunately that is now a thing of the past since auto-sync became common. |