Manchester T1
Just read this recently on Manchester website:
<font face="Verdana, Arial, Helvetica" size="2">Ground Level Check-in Expansion works will start in the new year in the ground level check-in area. The check-in hall will be opened out and an additional eleven check-in desks will be installed together with an enhanced baggage handling system. These works are being undertaken to increase capacity to meet the Airport's growing schedule of flights and destinations.</font> [This message has been edited by SFly (edited 07 April 2001).] |
All times are GMT. The time now is 07:42. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.