PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Rotorheads (https://www.pprune.org/rotorheads-23/)
-   -   The $400M helicopter... with nuclear bomb proof kitchen (https://www.pprune.org/rotorheads/385587-400m-helicopter-nuclear-bomb-proof-kitchen.html)

mickjoebill 18th August 2009 01:23

The $400M helicopter... with nuclear bomb proof kitchen
 
Is this report accurate?
One of the new marine one EH-101 helicopters will cost more than the price of two of the existing Airforce One 747s???


Nuclear attack no time for a snack: Obama - ABC News (Australian Broadcasting Corporation)

This for adaption of an existing airframe!

Mickjoebill

widgeon 18th August 2009 09:20

"Mr Obama's comments come after he pledged to fight against "exotic projects that are years behind schedule and billions over budget" in a speech to the Veterans of Foreign Wars service organisation."

Not to encourage thread drift , but what other rotary wing project falls into this catagory ?.

Pandalet 18th August 2009 10:35

Possibly the Osprey tilt-rotor, depending on which statistics you look at / who you believe.

powerstall 18th August 2009 10:52

I agree with the bomb proof kitchen... but in the heli? :confused:

Would you want anybody messing with your Thanksgiving Turkey when it's in the oven? i know i wouldn't! :eek:

Hilife 18th August 2009 11:59

One would hope the ‘Thunder Box’ was equally well protected. ;)

Robbo Jock 18th August 2009 12:18


The new helicopter was to be based on Lockheed's EH-101 aircraft, currently produced by a British-Italian partner
Interesting take on the parentage of the aircraft.

Brilliant Stuff 18th August 2009 12:59

I believe Airforce One was a fixed price contract. I ahven't finished reading he book yet though.

widgeon 18th August 2009 21:05

To be fair to AW ( and even Bell Boeing ) there is only one recent Helicopter Procurement in the USA that has been on budget and on time. The Lakota .UH1 Whisky and Yankee are both late and overbudget , ARH Cancelled , Commanche Cancelled , CH53K now under a gag order . In fact the last succesful procurement before Lakota was Blackhawk. I don't believe that the most blame is with the manufacturer. Caveat Emptor .
They need to fix the process.


All times are GMT. The time now is 16:08.


Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.