HEC and Lightning question
I'm involved in STC approving a Human External Cargo dual hook system, which will use a Y harness, down line, and other harness and hardware parts. (This is not a winch operation, off the cargo hooks). The certifying authority is requiring that I demonstrate lighting strike resistance for the configuration, and I cannot figure out how this would be possible. I have proposed the flight limitation "Day VFR only, Flight in the vicinity of lighting storms prohibited" but this is not being accepted. The authority has replied by suggesting bonding the person on the line to the helicopter. I'm convinced that this would be practically impossible. Further to this, I imagine that if the person were bonded, they then carry a possible static charge of the helicopter in flight, and could expect a shock when set onto the ground during normal operations.
Can anyone offer any wisdom and experience with HEN lightning compliance (or exemption), which I may use to modify the proposed design, or refute the regulator's expectations? I am only approving the dual hook system on the helicopter, everything hooks down is already STC approved and I do not intend to reapprove it. The hooks are bonded to the helicopter airframe. But I'm being told that if I want to include the [already STC approved] "soft goods", I have to demonstrate compliance for them too - and I'm stuck. Is there any documented history of HEC persons taking a lightning strike? What about non human long line loads? Any experienced thoughts would be appreciated.... Pilot DAR |
I imagine that if the person were bonded, they then carry a possible static charge of the helicopter in flight, and could expect a shock when set onto the ground during normal operations. At the French National Helicopter Championships in 1990, I watched a HEC demonstration with a mountain rescuer and a dog on harness, suspended below an Alouette - there were actual lighting strikes hitting the ground around much of the airfield but they carried on - no-one got fried so perhaps your regulators are being a little over-cautious. |
I cannot claim any knowledge or competence.... but a quick Google shows that this company appears to have figured out this conundrum, at least within Transport Canada's bailiwick. Your problem may of course be with a completely different authority, but is there an option for you to discuss this topic with these experts, or are you working for the competition? ;)
|
I was going to suggest reaching out to Haverfield Aviation. They do a lot of work placing lineman onto transmission structures operating at voltages up to 500 Kv.
|
About 2013 I completed something similar in the UK and gained EASA STC approval. It has a HEC with two people in a basket specifically designed for 'live line working'. i.e. the guys in the basket carried out maintenance/repair work on live high tension power lines. All whilst the whole lot dangled from a hovering AS355NP.
In this instance we had to do a lot of work to prove that the people and basket were electrically isolated from the helicopter. The complete opposite of what you are being asked. We used high dielectric 'ropes'. The aircraft was/is limited to 'Day VFR' with the rig installed. Not sure that helps you though... |
Originally Posted by Pilot DAR
(Post 11181495)
I'm involved in STC approving a Human External Cargo dual hook system, which will use a Y harness, down line, and other harness and hardware parts. Any experienced thoughts would be appreciated....
https://www.ecfr.gov/current/title-14/chapter-I/subchapter-C/part-27/subpart-D/subject-group-ECFRc1a5e0bbe2be31b/section-27.865 https://www.faa.gov/other_visit/aviation_industry/airline_operators/airline_safety/info/all_infos/media/2012/InFO12015.pdf https://www.faa.gov/other_visit/aviation_industry/airline_operators/airline_safety/safo/all_safos/media/2018/SAFO18004.pdf https://rgl.faa.gov/Regulatory_and_G...E/SW-18-15.pdf |
Thanks for the replies so far! I'll do my research with the leads, and see where I can get to with the authority...
More thoughts very welcomed. |
I know this won’t help one iota, but the words “Authorities and Regulators” is going to be a world of pain and how many hoops can you jump through.
the majority of these people will only tick/check boxes, hopefully find someone with some common sense that can figure this problem out with you and possibly help others in the future. |
The links were very informative, thanks Wrench.
“Authorities and Regulators” is going to be a world of pain and how many hoops can you jump through |