Go Back  PPRuNe Forums > Aircrew Forums > Rotorheads
Reload this Page >

S76A++ end of the road????

Wikiposts
Search
Rotorheads A haven for helicopter professionals to discuss the things that affect them

S76A++ end of the road????

Thread Tools
 
Search this Thread
 
Old 19th Nov 2020, 12:42
  #21 (permalink)  
 
Join Date: Mar 2020
Location: Guernsey
Posts: 17
Received 1 Like on 1 Post
Originally Posted by helipixman
I see 2-BYDF flew to Bournemouth Hurn on 12th November.... is this it's new base or just a stop on its way to her new owners ?

I believe she didn’t go to Bournemouth at all. Flew to near Yeovil. Buyer lives close. Flight Radar24 may have said otherwise but no, didn’t go to Bournemouth.
Channel Flyer is offline  
Old 19th Nov 2020, 13:23
  #22 (permalink)  
 
Join Date: Jul 2002
Location: UK
Posts: 2,956
Received 17 Likes on 11 Posts
Originally Posted by Channel Flyer
Flew to near Yeovil. Buyer lives close.
Was it an historic moment?
Bravo73 is offline  
Old 19th Nov 2020, 14:18
  #23 (permalink)  
 
Join Date: Jun 2006
Location: In the air with luck
Posts: 1,018
Received 1 Like on 1 Post
Not necessarily so
500e is offline  
Old 19th Nov 2020, 14:25
  #24 (permalink)  
 
Join Date: Jun 2016
Location: Stagnation Point
Posts: 62
Likes: 0
Received 1 Like on 1 Post
Originally Posted by Channel Flyer
Are you certain the D blades would have fit? I’m certain they wouldn’t and I doubt Sikorsky would even allow it.

They would indeed fit, but in terms of airworthiness, they are not certified.
Droop Snoot is offline  
Old 19th Nov 2020, 22:30
  #25 (permalink)  
 
Join Date: May 2002
Location: Wanaka, NZ
Posts: 2,569
Likes: 0
Received 2 Likes on 2 Posts
I would imagine a new set of D-blades would be worth more than the whole helicopter....
gulliBell is offline  
Old 20th Nov 2020, 04:05
  #26 (permalink)  
 
Join Date: Sep 2004
Location: daworld
Posts: 642
Likes: 0
Received 2 Likes on 2 Posts
Originally Posted by gulliBell
I would imagine a new set of D-blades would be worth more than the whole helicopter....
Quite possibly. A guy here in Canada just bought three C++ for 1.5mil US$.

Not each, that is the total cost for all three machines. 500k each! For C++!!

Looks like he is keeping one for private and selling two.
noooby is offline  
Old 20th Nov 2020, 10:43
  #27 (permalink)  
 
Join Date: May 2002
Location: Wanaka, NZ
Posts: 2,569
Likes: 0
Received 2 Likes on 2 Posts
That sounds about right, $500K for a C++. If it were me I'd keep one C++ as my private weekend getaway ride and break the other two down for spares. I like the C++, if only they weren't so expense to run.
gulliBell is offline  
Old 21st Nov 2020, 04:12
  #28 (permalink)  
 
Join Date: Sep 2005
Location: Montreal
Posts: 714
Received 13 Likes on 10 Posts
20 years ago we were costing the A++ at $1100/hr when bidding contracts, but they were the old phase 2 and didn't have the expensive bits of the C++ like DECU, EFIS, IIDS, FDC.
Helicopters seem to age out in some countries/markets and not in others. Lots of old 212's, 412's, 76's still working here, and yet the local "money-no-object" medvac charities that bought the latest and greatest fleet of AW139 have dumped them all now in favour of even newer EC145 (Noooby, any insights?). Hell, a couple days ago I overheard an old Bell 47 call sign that I had done training in 30 years ago that was still out there beating the sky for a living. Wondered how old it was and it turned out to be 68 (1952 manufacture). So that 76A++ in good nick still has a long run ahead of it.

Last edited by malabo; 21st Nov 2020 at 16:35.
malabo is offline  
The following users liked this post:
Old 21st Nov 2020, 10:40
  #29 (permalink)  
 
Join Date: May 2002
Location: Wanaka, NZ
Posts: 2,569
Likes: 0
Received 2 Likes on 2 Posts
I dare say the fuel bill alone would be close to $1100/hr today.
gulliBell is offline  
Old 21st Nov 2020, 23:55
  #30 (permalink)  
 
Join Date: Aug 2001
Location: 50 50 Broome
Posts: 112
Likes: 0
Received 0 Likes on 0 Posts
I dare say the fuel bill alone would be close to $1100/hr today.
At a burn of 360 litres per hour How much do to pay for your Jet A1?
Brother is offline  
Old 22nd Nov 2020, 12:27
  #31 (permalink)  
Thread Starter
 
Join Date: Dec 2000
Location: uk
Posts: 1,659
Received 1 Like on 1 Post
2-BYDF burns around 600lbs of fuel per hour. Is one of the fastest S76’s I’ve ever flown and was super smooth. The monthly running costs were impressive due to the fact she is so reliable. In 6 years I only ever had one occasion where we couldn’t depart the island due to a mechanical issue, which I have to add was fully rectified by 10am the next day. Impressive when you think of the logistics involved.

I hope she goes on to provide many more years of service to the new owners if they can get the maintenance coverage they’ll need for it.
helimutt is offline  
Old 24th Nov 2020, 17:16
  #32 (permalink)  
 
Join Date: Sep 2004
Location: daworld
Posts: 642
Likes: 0
Received 2 Likes on 2 Posts
Originally Posted by malabo
20 years ago we were costing the A++ at $1100/hr when bidding contracts, but they were the old phase 2 and didn't have the expensive bits of the C++ like DECU, EFIS, IIDS, FDC.
Helicopters seem to age out in some countries/markets and not in others. Lots of old 212's, 412's, 76's still working here, and yet the local "money-no-object" medvac charities that bought the latest and greatest fleet of AW139 have dumped them all now in favour of even newer EC145 (Noooby, any insights?). Hell, a couple days ago I overheard an old Bell 47 call sign that I had done training in 30 years ago that was still out there beating the sky for a living. Wondered how old it was and it turned out to be 68 (1952 manufacture). So that 76A++ in good nick still has a long run ahead of it.
When the Provincial Govt give you an EC145 for free and the Federal Govt give you four EC145 for free, you find that your fleet suddenly becomes the EC145. And then the STARS CEO had to issue an apology for reporting to CBC Saskatoon that the 139's were being retired because they were "technologically outdated". Ouch. I believe Ornge are still operating the 139?
noooby is offline  
Old 26th Nov 2020, 18:19
  #33 (permalink)  
 
Join Date: Jun 2008
Location: Canada
Posts: 69
Likes: 0
Received 0 Likes on 0 Posts
Yes, we still operate the 139 and it will not change anytime soon after installing the huge Mod stretcher to please our medics....How can we go to a smaller machine now when this stretcher won' fit anywhere else ??
Cost is high, maintenance horrible with aircraft down for 2 months for heavy maintenance. An expensive tool....
Arcal76 is offline  
Old 29th Nov 2020, 22:16
  #34 (permalink)  
 
Join Date: Nov 2010
Location: Canada
Posts: 132
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Arcal76
Yes, we still operate the 139 and it will not change anytime soon after installing the huge Mod stretcher to please our medics....How can we go to a smaller machine now when this stretcher won' fit anywhere else ??
Cost is high, maintenance horrible with aircraft down for 2 months for heavy maintenance. An expensive tool....
they could at least paint them with a product/colour that lasts - it’s embarrassing
MLHeliwrench is offline  
Old 1st Dec 2020, 12:44
  #35 (permalink)  
 
Join Date: Oct 2009
Location: West Sussex
Age: 84
Posts: 148
Likes: 0
Received 0 Likes on 0 Posts
Two months for heavy maintenance, ? we used to be able to do a major check on a 212 in Two weeks, I thought progress meant improving things.
Dave B is offline  
Old 1st Dec 2020, 20:17
  #36 (permalink)  
 
Join Date: Sep 2004
Location: daworld
Posts: 642
Likes: 0
Received 2 Likes on 2 Posts
Originally Posted by Dave B
Two months for heavy maintenance, ? we used to be able to do a major check on a 212 in Two weeks, I thought progress meant improving things.
Don't blame the machine. Oil and Gas operators, who staff their bases properly, do get the inspections done quicker. We used to do the 300 hour in 3 days. A 4 year would be a couple weeks. As for "cost is high", a 139 is cheaper to purchase than a 76D and the DoC's are proven to be very close, if not better than a 76C++ (don't know DoC's for a 76D sorry). O&G operators proved that over and over again.
76's were perfect for mechanics though. They're job security because something always breaks. All the mechanics said I'd be first out of a job because I only worked on the 139 and there wasn't much to do compared to the 76.
noooby is offline  
Old 1st Dec 2020, 23:14
  #37 (permalink)  
 
Join Date: Mar 2011
Location: London/Atlanta
Posts: 446
Received 13 Likes on 10 Posts
Originally Posted by helimutt

As she now sits. She flew very smoothly and was a fast 76 compared to others.
That is a fine looking machine for the money, I appreciate running and maintenance costs but would a low hour using VIP be happier with this as opposed to say a newer 109..... I am a bit of a snob, so who would have the bragging rights on arrival at Ascot, Goodwood or Silverstone?
nomorehelosforme is offline  
Old 2nd Dec 2020, 04:55
  #38 (permalink)  
 
Join Date: Apr 2007
Location: Out there
Posts: 362
Received 10 Likes on 7 Posts
Originally Posted by Dave B
Two months for heavy maintenance, ? we used to be able to do a major check on a 212 in Two weeks, I thought progress meant improving things.
I know of an operation that takes three months to do an annual on a 412
Evil Twin is offline  
Old 2nd Dec 2020, 10:20
  #39 (permalink)  
 
Join Date: Dec 2005
Location: England
Posts: 1,459
Received 34 Likes on 20 Posts
Originally Posted by noooby
Don't blame the machine. Oil and Gas operators, who staff their bases properly, do get the inspections done quicker. We used to do the 300 hour in 3 days. A 4 year would be a couple weeks. As for "cost is high", a 139 is cheaper to purchase than a 76D and the DoC's are proven to be very close, if not better than a 76C++ (don't know DoC's for a 76D sorry). O&G operators proved that over and over again.
76's were perfect for mechanics though. They're job security because something always breaks. All the mechanics said I'd be first out of a job because I only worked on the 139 and there wasn't much to do compared to the 76.

I remember a shift supervisor (A.S.) at Air Hanson who said

" I won't hear a bad word said about the S76, the overtime is paying my mortgage."!!!!


As for heavy maintenance it depends exactly what you are doing. A heavy check on a 139 is about 2 weeks.
We did a G check on a 365 in twelve weeks. That included a full bare metal respray and a complete gut of the aircraft down to the fuselage on jacks tailboom off, with just the looms and long hydraulic lines in situ. Canopy structure replaced as well.

The S76's didn't have a heavy check all work was carried out as a continuous process. Can't say I agreed with that but it worked.

Each operator does it's own thing.


Last edited by ericferret; 2nd Dec 2020 at 10:30.
ericferret is offline  
Old 1st Aug 2023, 23:48
  #40 (permalink)  
 
Join Date: Aug 2023
Location: Rio de Janeiro
Posts: 1
Likes: 0
Received 0 Likes on 0 Posts
O'lá, Ainda sabe do paradeiro dessas maquinas ?????

Preciso de 2 urgente
Douglas Marins is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.