Radar Approach Separation (from Bristol Question Bank)
Horizontal separation - Independent parallel approaches. A minimum radar separation shall be provided until aircraft are established inbound on the ILS localizer course and/or MLS final approach track. This minimum is, when independent parallel approaches are being conducted:;
1, 2, 3 or 5nm? The answer given is 3 (although it could be as low as 2.5nm). I thought that the 2.5nm separation could only be applied once the two aircraft are established on the same localiser not beforehand as the question states. Clarification would be great. :confused: Many thanks! |
3 is correct as you ain't on the parallel approach track, yet.
Question/answer looks OK to me. IE: RTFQ |
You might try moving this to the ATC Forum?
|
411A! Wilco! :bored:
|
All times are GMT. The time now is 16:12. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.