AUKUS
Ecce Homo! Loquitur...
Thread Starter
"The prospect of British submarines being based out of Perth with Australian sailors on board to undergo nuclear training will be advanced, with the head of the UK military to hold top-level talks with Australian officials next week."
https://www.afr.com/politics/federal...0220720-p5b36w
Military chiefs to hold talks on basing UK nuclear submarines in Perth
https://www.afr.com/politics/federal...0220720-p5b36w
Military chiefs to hold talks on basing UK nuclear submarines in Perth
Yep - not surprised by that.
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418
Last edited by tartare; 20th Jul 2022 at 23:34.
Join Date: Jul 2008
Location: Australia OZ
Age: 74
Posts: 2,450
Likes: 0
Received 31 Likes
on
29 Posts
Another 22 Jul 2022 report:
https://www.msn.com/en-au/news/australia/fleet-of-nuclear-submarines-will-be-sent-by-britain-to-australia-as-a-warning-to-china/ar-AAZPBMG
"...Last night the MoD said: ‘It is UK policy that we do not comment on matters relating to submarine activity or operations.’"
https://www.msn.com/en-au/news/australia/fleet-of-nuclear-submarines-will-be-sent-by-britain-to-australia-as-a-warning-to-china/ar-AAZPBMG
"...Last night the MoD said: ‘It is UK policy that we do not comment on matters relating to submarine activity or operations.’"
Yep - not surprised by that.
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418
"The yard has said it can increase and build 3 Virginia's a year. "
Well of course they have - but CAN they ? over the last 30 years getting vessels of any type out of any yard anywhere on time and cost has been a bit fraught. And all the N sub makers have had serious issues.
The fastest way for the RAN is to takeover some early Virginias on lease -that will minimise impact on the USN and allow the RAN to get up to speed with the very different operating environment of an SSN
Well of course they have - but CAN they ? over the last 30 years getting vessels of any type out of any yard anywhere on time and cost has been a bit fraught. And all the N sub makers have had serious issues.
The fastest way for the RAN is to takeover some early Virginias on lease -that will minimise impact on the USN and allow the RAN to get up to speed with the very different operating environment of an SSN
It also indicates that they will struggle to release skilled managers to loan to ASC for the construction at Osborne.
As far as getting RAN personnel up to speed on Nukes, I suspect that the USN may end up home porting 2 Virginia’s at Fleet Base West. These vessels would be manned with experienced USN trainers and RAN submariners and would be deployed on normal USN missions. In this way, the USN would retain their critically needed submarines but assist the RAN in getting sufficient submariners trained before the ASC built vessels enter service. This obviously assumes that the RAN & Government choose the Virginia over the Astute.
That’s not what they are telling Congress, the fact that construction of the Columbia class SSBN has absolute priority over every other military program has meant that most of the skilled workers at GDEB & HII have been moved onto that program so the completion and delivery of new Virginia SSN’s has been adversely affected with significant delays being experienced, especially with the Block 5 boats. They are currently unable to deliver 2 Virginia’s per annum as they can’t find sufficient staff and get them trained to a competent level.
It also indicates that they will struggle to release skilled managers to loan to ASC for the construction at Osborne.
As far as getting RAN personnel up to speed on Nukes, I suspect that the USN may end up home porting 2 Virginia’s at Fleet Base West. These vessels would be manned with experienced USN trainers and RAN submariners and would be deployed on normal USN missions. In this way, the USN would retain their critically needed submarines but assist the RAN in getting sufficient submariners trained before the ASC built vessels enter service. This obviously assumes that the RAN & Government choose the Virginia over the Astute.
It also indicates that they will struggle to release skilled managers to loan to ASC for the construction at Osborne.
As far as getting RAN personnel up to speed on Nukes, I suspect that the USN may end up home porting 2 Virginia’s at Fleet Base West. These vessels would be manned with experienced USN trainers and RAN submariners and would be deployed on normal USN missions. In this way, the USN would retain their critically needed submarines but assist the RAN in getting sufficient submariners trained before the ASC built vessels enter service. This obviously assumes that the RAN & Government choose the Virginia over the Astute.
I pretty much agree with what you said, a somewhat interesting side note. I have a friend who applied for and looks to have a been successful (accepted by previous govt but not yet confirmed by new govt) for the 20K grant to study nuclear engineering. He seems to believe that Australians will mostly be going to the UK nuclear engineering school as they have more spare capacity than the american school does atm. Also most of the sub officers goto either british or dutch perisher
If it were only about the boat, this decision would be a no-brainer.
But it is not. Perhaps this article has been fielded before, but it gives an idea of the magnitude of the decision.
Virginia vs Astute
IG
But it is not. Perhaps this article has been fielded before, but it gives an idea of the magnitude of the decision.
Virginia vs Astute
IG
That’s not what they are telling Congress, the fact that construction of the Columbia class SSBN has absolute priority over every other military program has meant that most of the skilled workers at GDEB & HII have been moved onto that program so the completion and delivery of new Virginia SSN’s has been adversely affected with significant delays being experienced, especially with the Block 5 boats. They are currently unable to deliver 2 Virginia’s per annum as they can’t find sufficient staff and get them trained to a competent level.
https://news.usni.org/2020/11/18/nav...pyard-capacity
The Navy has “full confidence we can ramp up” to building three attack submarines per year if the Navy buildup proposed by former Defense Secretary Mark Esper were to be enacted, despite ongoing delays in Block IV Virginia-class construction, the program executive officer for submarines said today.
Last edited by golder; 22nd Jul 2022 at 14:11.
Ecce Homo! Loquitur...
Thread Starter
Contractors always swear they can perform up to the moment the contract is signed - then the delays are always factors outside their control, especially the inevitable contract changes…
That's what they say but "despite ongoing delays in Block IV Virginia-class construction, " shows there is still a problem with current build rates.
As I've said NO country is able to deliver SSN/'s and SSBN's on time - they are extremely complex bits of kit
As I've said NO country is able to deliver SSN/'s and SSBN's on time - they are extremely complex bits of kit
Pretty sure all the early virginia's were on time, or close enough for government work. They block V's have been delayed but all the a earlier blocks have been near enough to on schedule. The block V are having issues because of covid and being ordered to a prioritise the columbia class
Part of the reason is that some lifetime parts aren't lasting a lifetime. They were stolen from current build and they are now delayed till the new replacement parts come.
Join Date: Dec 2021
Location: Noumea
Posts: 18
Likes: 0
Received 0 Likes
on
0 Posts
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Evertonian
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
With a Labor Govt in now (who never really want to talk nuke), and with our appalling and delayed procurement process, and the limited SSN supply pool, and the virtual lack of an AUS nuke industry and knowledge, nuke subs are not only a way off - but also delays will likely lead to a lack of interest as the project falls by the wayside.
But there is much benefit in ongoing AUKUS 3-eyes common procurement (of airframes for instance), intel, basing, networking, policy, procedures, exercises, operations, and dialog.