Boldface,

"Clearly you are not familiar with the state of the MRA4 project PP."

I hear whispers that all is not well with MRA4, but superficially there is nothing being released or written about to contradict the broad idea that after the early difficulties (those which led to the switch from Bournemouth to Woodford, the consequent delays and disruption, the fit of the new wings), which were presumably solved (or en route to being solved) when the contract was restructured in February 2003, it has all been plain sailing, apart from some minor hiccoughs - like the longitudinal stability issues.

The broad impression being given is that it's much the same as Typhoon was a few years ago - late, having suffered massive cost escalation, but fundamentally back on track (albeit with a much later ISD), and with some real improvements having been made in the intervening years.

I'm starting to hear a VERY different story, however, that MRA4 remains a disaster, and perhaps even that the AEW3 would be a better basis for comparison.

Plenty of folk here must know the truth.
Jackonicko is offline  
Old 27th Mar 2008, 13:26
  #22 (permalink)  
 
Join Date: Apr 2006
Location: Portsmouth
Posts: 513
Received 156 Likes on 83 Posts
Naughty, naughty Jacko. That Grauniad excerpt isn't actually what the DSC recommends, even if it's what you'd like. I expect the journo was briefed by Michael Quillan....

They do express incredulity "that MoD cannot explain the delay in signing the main production contracts" though.

Interestingly, rather than point out that the MoD is not adequately funded to deliver the policy of HMG (namely the capabilities required by SDR), they lapse into "unaffordability" and cancellation of MRA4. They're normally much better than that....
Not_a_boffin is offline  
Old 27th Mar 2008, 13:35
  #23 (permalink)  
 
Join Date: Apr 2004
Location: troon
Age: 61
Posts: 551
Likes: 0
Received 0 Likes on 0 Posts
Yes, yes, I've read and understood all of the stuff about land-based and sea-based air power being complementary in an ideal world. But this isn't an ideal world and we can't afford it. Land-based air power can be useful on its own, naval air power isn't
What do you mean by saying we cant afford it Jacko?

In the Falklands we couldn't afford to lose ships to Air attack (and we had a damn sight more capable Air to Air Surface to air capability) How many millions did all they cost to replace? I can go along with the CVF cancelation if there were a couple of decent LHD's on the offing but then again we'd be back to square 1 tendering and all the other crap that goes with it.
What would you suggest for the RN?

BTW I do believe That NAVAL AIR POWER has done its bit in both Afganastan and Iraq and the last time I looked they could be based both ashore and aboard. Try doing that with a Typhoon.
althenick is offline  
Old 27th Mar 2008, 13:42
  #24 (permalink)  
 
Join Date: Sep 2006
Location: Bridgwater Somerset
Posts: 459
Likes: 0
Received 0 Likes on 0 Posts
The MOD are holding a press briefing at 2pm today. maybe we will hear something after that re MRA4.
Tappers Dad is offline  
Old 27th Mar 2008, 13:52
  #25 (permalink)  
 
Join Date: Mar 2007
Location: The Inner Planets
Posts: 64
Likes: 0
Received 0 Likes on 0 Posts
I'm starting to hear a VERY different story, however, that MRA4 remains a disaster, and perhaps even that the AEW3 would be a better basis for comparison.
You may think that. I couldn't possibly comment!
Boldface is offline  
Old 27th Mar 2008, 14:09
  #26 (permalink)  
 
Join Date: Aug 2007
Location: UK
Posts: 193
Likes: 0
Received 0 Likes on 0 Posts
2pm

Isn't it the tanker PFI at 2?
hulahoop7 is offline  
Old 27th Mar 2008, 14:26
  #27 (permalink)  
 
Join Date: Jan 2004
Location: Far West Wessex
Posts: 2,577
Received 4 Likes on 2 Posts
MRA4 is vulnerable because there is a substitute available - the P-8A, apparently running quite well, IOC 2013, brand-new airframes that will cost less to run than MRA4 ever will, common upgrade program with the US and (almost certainly) Australia.

The question is whether things are worse than they appear from the official dates and money numbers.
LowObservable is offline  
Old 27th Mar 2008, 14:37
  #28 (permalink)  
 
Join Date: Jan 2005
Location: Over the rainbow
Posts: 310
Likes: 0
Received 0 Likes on 0 Posts


In the Falklands we couldn't afford to lose ships to Air attack (and we had a damn sight more capable Air to Air Surface to air capability) How many millions did all they cost to replace?


Were they ever replaced ? I don't think so.




'We knew how to whinge but we kept it in the NAAFI bar.'
philrigger is offline  
Old 27th Mar 2008, 15:07
  #29 (permalink)  
 
Join Date: Apr 2004
Location: troon
Age: 61
Posts: 551
Likes: 0
Received 0 Likes on 0 Posts
Were they ever replaced ? I don't think so.
Good point philrigger,
althenick is offline  
Old 27th Mar 2008, 15:22
  #30 (permalink)  
 
Join Date: Aug 2002
Location: London (Babylon-on-Thames)
Age: 42
Posts: 6,168
Likes: 0
Received 0 Likes on 0 Posts
Wow so you can have a new B737 airframe rather than a rebuilt Comet airframe. Only in the UK would we ever have considered the bloody Nimrod fiasco. Curious that the same aircraft type could be a cataclysmic disaster twice (!)
Skipness One Echo is offline  
Old 27th Mar 2008, 15:29
  #31 (permalink)  
 
Join Date: Jan 2000
Location: UK
Posts: 93
Likes: 0
Received 0 Likes on 0 Posts
Isn't the AWACS a Nimrod replacement?

I seem to recall in the 80's a Nimrod with radars front and rear eating money like it was going out of fashion. Have we to learn these old lessons time and time again?
owe ver chute is offline  
Old 27th Mar 2008, 15:31
  #32 (permalink)  
 
Join Date: May 2003
Location: London/Oxford/New York
Posts: 2,921
Received 137 Likes on 62 Posts
philrigger and althenick,

They were ALL replaced, by much more capable vessels (T22B3) as was all the gear lost in the Falklands.

A long time ago though..............................
pr00ne is offline  
Old 27th Mar 2008, 15:35
  #33 (permalink)  
 
Join Date: Apr 2004
Location: troon
Age: 61
Posts: 551
Likes: 0
Received 0 Likes on 0 Posts
Just had a wee scan of the CDS document. They aren't suggesting cutting the capability just the project. So I have a question for anyone out there who is in the know -

- How long could the current Nimrod fleet soldier on?
- To preserve airframes could other aircraft take on some of roles of Nimrod?(I'm thinking of 750 sqn Taking over short range SAR duties for example)
- A cheap and cheeful replacement?

any ideas?
althenick is offline  
Old 27th Mar 2008, 15:37
  #34 (permalink)  
 
Join Date: May 2006
Location: 2 m South of Radstock VRP
Posts: 2,042
Likes: 0
Received 0 Likes on 0 Posts
The none journo corrupted document is at;
http://www.publications.parliament.u...ce/295/295.pdf

It's good to see that the Committee is comprised of well informed experts:

Q98 Chairman: But other countries struggle by
without Nimrods?

Mr Gould: They certainly have struggled. Most
other countries that have this use something called
the P3 which is a Lockheed Orion aircraft. That was
a contender, but it does not have the endurance of
Nimrod. Indeed, the Americans are moving to the
multi-role maritime aircraft and have been
struggling for about 15 years to try to find a way to
move from the P3 design to something more
capable.

Q99 Mr Holloway: It just seems bizarre to be doing
this to a rotting old 1950s aircraft?

Mr Gould: Most of it is new.

Q100 Mr Holloway: Not the one that I went on
recently, although maybe the electronic gizmos are
new.

Mr Gould: The wings, engines and undercarriage
are new.

Q101 Robert Key: The airframe is not.

Mr Gould: The fuselage is not.
GOLF_BRAVO_ZULU is offline  
Old 27th Mar 2008, 15:40
  #35 (permalink)  
 
Join Date: Apr 2004
Location: troon
Age: 61
Posts: 551
Likes: 0
Received 0 Likes on 0 Posts
*****e

Just googled and true enough they replaced with ships that were predominantly ASW/ASUW platforms. Ironic really you lose Air Defence Ships to Air Attack which they were designed to repel and replace them with something less capable of that role!

FAA got more shars though!
althenick is offline  
Old 27th Mar 2008, 16:18
  #36 (permalink)  
 
Join Date: Jul 2000
Location: Just behind the back of beyond....
Posts: 4,175
Received 3 Likes on 2 Posts
AlltheN, Widger, et al.

The fact that you have to go back to 1982 to illustrate the military need for a carrier tells the story.

In those days, with that budget, I was a huge supporter of carriers.

But today, we live in a different world.

LO,

A P-8 might cost less to operate, though given Boeing's record on the Wedgetail and KC-767, I'd hesitate before viewing it as being low risk. Nor does a twin-fan airliner fill me with confidence for a role which requires the platform to get down and dirty, manoeuvring quite hard as it flies the ASW cloverleafs, prosecuting an attack with torpedoes, etc.

Back to the Nimrod.....

When having information in the public domain would aid an enemy, then plainly, the public’s right to know MUST be subordinate to military secrecy. On this basis, I’d be nervous about seeing in print any detailed information relating to current deployments, tactics, and weapons and sensor system parametrics.

However, a culture of secrecy has grown up that treats all information with equal caution, historic, or current, operational or relating to procurement. That’s something I’m less anguine about.

Often, especially in the procurement field, such secrecy actually serves to damage our armed forces more deeply and more fundamentally than would revealing which squadron is presently based at (say) Kandahar with x number of jets. And I’d suggest that keeping Nimrod MRA4’s problems under wraps is a good example of damaging secrecy – whose only purpose can be to protect the contractor (whose reputation might be damaged by revelations about all the cock-ups), and to protect the reputations of the politicians and senior officers on whose watch these problems have occurred.

There is no doubt that there have been problems!

Air Staff Requirement Number 420 was issued, initially calling for 25 Replacement Maritime Patrol Aircraft with an In Service Date of 2003.

On 27” July 1996 the decision to award the contract to British Aerospace, was announced. The contract, now for only 21 aircraft and worth just over two billion pounds sterling, was eventually signed with British Aerospace on 2”d December 1996.

When the Nimrod MRA4 contract was let with BAE Systems in December 1996 the In-Service Date (ISD) was still set at April 2003. That ISD was defined as the date when seven aircraft were to be fully operational. The twenty-first and final aircraft was to be delivered to the Royal Air Force in 2006.

(So why did they call it Nimrod 2000?)

BAE Systems advised the Defence Procurement Agency (DPA) that they could not meet this date in late 1998, following technical and resource problems.

The Nimrod MRA4 was identified as one of the Smart Procurement Initiative's pilot Integrated Project Teams (IPTs) in November 1998 - led by Air Commodore Barry Thornton, who was succeeded by Mr David King in January 2001 as IPT Leader. This meant that MRA4 became headlined as the flagship of SMART procurement – an irony in view of what was to happen.

The contract was ‘re-baselined’ In May 1999, following extensive negotiations, and a new ISD of March 2005 was set. This represented a delay of 23 months. The new In Service Date (ISD) of March 2005 was defined as being marked by the delivery of the 7th aircraft. The Nimrod MRA4 was due to enter operational service in August 2004 (this was NOT the ISD) and the 21st and final aircraft was due for delivery in December 2008.

A further change to the contract was agreed in 2001/02, including a two-stage capability demonstration prior to ISD. (“To mitigate this risk, MOD and BAE SYSTEMS have agreed to an Incremental Capability Acquisition approach. This comprises the acceptance of aircraft in two steps, an initial capability being demonstrated by the time of first aircraft delivery will full specification compliance being demonstrated by the time of the seventh aircraft delivery and ISD.”) It was then recognised that the ISD might prove to be late 2005.

The number of aircraft required was reduced to 18 in view of the assessed increase in capability and availability of the MRA4 over the MR2, and citing a perceived reduction in the submarine threat – or was the reduced number of aircraft, at the same overall cost, actually intended to compensate industry?

By the end of 2002, it was clear that the overlap of development and production activities was leading to further timescale problems. In February 2003 BAE SYSTEMS and MoD agreed to revise the programme again, aiming to reduce risk in development by delaying production work, allowing the design of the aircraft is proven during the flight trials programme. Once an acceptable level of demonstrated performance was achieved, the series production of the remaining 15 aircraft would recommence. This restructuring of the programme would result in a four year delay to the in-service date to 2009.

The February 2003 Agreement changed the contract from the previous fixed price basis, to a Target Cost Incentive Fee (TCIF) arrangement for Design and Development. A contract amendment to this effect was signed on 23 February 2004. This mechanism was supposed to be the best means of incentivising BAE SYSTEMS to deliver the aircraft without further cost and time slippage. Why has it not done so?

ISD was now defined as the Delivery of the sixth production standard aircraft to the Royal Air Force.

In July 2004, the UK Ministry of Defence announced that this number was to be further reduced to 12 aircraft.

A further review of the programme identified increased production costs and that the In-Service Date for the capability would need to be delayed in order to make the programme affordable within Departmental funding constraints. A business case seeking authorisation of commitment to full production was approved in May 2006, and the contract was amended to re-introduce the production requirements in July 2006.

The UK MOD finally awarded the production contract for 12 Nimrod MRA4 aircraft In July 2006. Delivery of the first production aircraft was by then planned for 2009. The scheduled in-service date had slipped to 2010 and deliveries were scheduled to be completed in 2012. Nimrod MRA4 has an assumed in-service life of 25 years based upon 650 flying hours per year. This results in an out of service date (OSD) of 2035, but a longer life may be feasible.

The MPR07 Definition of ISD is the provision of 5 aircraft (4 deployable) and 6 combat ready crews. It was then scheduled for September 2010 – 89 months late.

The latest information is that MRA4 is now 92 months (7.5 years) late, inferring a December 2010 ISD, and £787 m (28% of the Approved Cost) over budget.

£100 m of this cost growth (“just a little less than three per cent of the total programme cost”) and three months of this delay have been added during the last year alone, giving the lie to any idea that the problems are over. Three months more delay, and £100 m more to the excess costs sounds to me like the programme is still spiraling out of control (albeit perhaps at a slower rotational rate).

David Gould CB, Chief Operating Officer, DE&S told the House of Commons Defence Committee that: “The production, flight trial and mission system programmes are going very well.”

Are they? Was he knowingly lying to Parliament?

The NAO’s Major Projects Report 2007 forecast that all Key User Requirements would be met. Is that true, or were they misled?

The MRA4 KURs are:

01 Maritime Counter Terrorism
02 Search & Detect (UWE)
03 Submarine Attack
04 Search & Detect (AWE)
05 Tactical Interoperability
06 Mission Completion
07 Maritime Presence
08 Operations in Hostile Environment
09 Environmental Operating Conditions

KUR 08 was originally judged as being ‘at risk’, but the NAO judges that the “Technical and financial issues now resolved surrounding procurement of Electronic Warfare Rig thereby allowing aircraft to operate with a self-defence capability. Business Case with Investment Appraisal under compilation. Procurement schedule being determined; anticipate KUR compliance when schedule and risks clearly identified.”

Cost snippet:
1998 - £2 bn order for 21 aircraft = £95 m each

2004 - £3.5 bn for 15 aircraft = £233 m each

2006 - Cost now £3.2 bn for 12 aircraft = £267 m each

2008 – Cost now £3.6 bn for 12 aircraft = £300 m each
Jackonicko is offline  
Old 27th Mar 2008, 16:23
  #37 (permalink)  
 
Join Date: Apr 2004
Location: troon
Age: 61
Posts: 551
Likes: 0
Received 0 Likes on 0 Posts
The fact that you have to go back to 1982 to illustrate the military need for a carrier tells the story
You'll need to go back to WW2 to justify Typhoon then using that logic
althenick is offline  
Old 27th Mar 2008, 16:34
  #38 (permalink)  
 
Join Date: Mar 2005
Location: MARS
Posts: 1,102
Received 10 Likes on 4 Posts
Hang on a minute Jackonory, you are tarring me with someone elses brush again. I have not mentioned 1982 once (there you see...he said it again...stone him) I am talking about the future and ensuring that the UK is prepared for the future and not squandering everything on a land war that we are currently in...if you take that line, then ditch Nimrod, ditch Challenger, ditch everything that does not involve fighting a guerilla war!

Read what I post....I am talking about resources and the lack of. I am talking about the growth of Russian, Chinese and Indian etc influence and the inevitable "grab" for land in places far away from fixed airfields, with their associated resources of oil, coal, gas, fish, minerals, diamonds etc. Antarctica is the one place left on earth that has not been exploited but this will not continue forever. Sooner or later, someone will turn around, (much like japanese whaling) and say "We are taking this land and it's resources". Only those with the strength and capability will be able to resist. Why do you think the Falkland Islands are so important?
Widger is offline  
Old 27th Mar 2008, 16:42
  #39 (permalink)  
 
Join Date: Jul 2000
Location: Just behind the back of beyond....
Posts: 4,175
Received 3 Likes on 2 Posts
AlltheNick,

Land based OS FJs are needed (and being used) right now.

The recent 'Bear' activity shows that UK AD FJs are needed right now.


Widger,

The Falklands can now be defended without carriers.

Carriers threaten core capabilities that we need right now.
Jackonicko is offline  
Old 27th Mar 2008, 17:01
  #40 (permalink)  
 
Join Date: Apr 2006
Location: Portsmouth
Posts: 513
Received 156 Likes on 83 Posts
If we're not going to do power projection, we don't need to be in sandy places, we don't need OS (or much else beyond AD & AWACS jets, OPVs and lots of infantry to bo honest).

As per overseas theatres, can't we rely on someone else to do AD for UK (only kidding this time!)

Carriers do not threaten core capabilities. The Treasury does. Endex.
Not_a_boffin is offline  

Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.