Go Back  PPRuNe Forums > Aircrew Forums > Military Aviation
Reload this Page >

Future Carrier (Including Costs)

Wikiposts
Search
Military Aviation A forum for the professionals who fly military hardware. Also for the backroom boys and girls who support the flying and maintain the equipment, and without whom nothing would ever leave the ground. All armies, navies and air forces of the world equally welcome here.

Future Carrier (Including Costs)

Thread Tools
 
Search this Thread
 
Old 21st Apr 2006, 13:45
  #81 (permalink)  
 
Join Date: Aug 2005
Location: Tennessee - Smoky Mountains
Age: 55
Posts: 1,602
Likes: 0
Received 1 Like on 1 Post
Noddy question -

What will happen to Invincible, Illustrious and Ark Royal? Sold/scrapped?

IIRC, Invincible was commissioned in 1978. That makes her 28 years old. The other two 4 or 5 years newer. Since the new carriers have a projected life of 50 years, this implies that the old ones are only halfway through their lives.

Is there any plan to retain the three existing ones in order to get maximum value from our investment (and increase fleet flexibility)?
Roadster280 is offline  
Old 21st Apr 2006, 14:31
  #82 (permalink)  
Suspicion breeds confidence
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,405
Likes: 0
Received 8 Likes on 3 Posts
Originally there were plans to have 5 Invincibles. Each one the centre of an ASW taskgroup. Then that got chopped back to three with two operational and now three with one operational. A 25 yr design life is the norm in the RN, not 35 or 50.
Navaleye is offline  
Old 21st Apr 2006, 15:38
  #83 (permalink)  
 
Join Date: Feb 2006
Location: In the dark
Posts: 391
Likes: 0
Received 0 Likes on 0 Posts
I
am sure those that command them, man them and fly from them (as well as EVERYBODY else) would ensure they are used as neccessary!
Who is going to man them? What sort of manpower numbers are we talking? Will enough people want to join the forces by the time they are in service? Does the Navy still have the apeal it used to? Are the current carriers 100% manned?
FormerFlake is offline  
Old 21st Apr 2006, 15:49
  #84 (permalink)  
Suspicion breeds confidence
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,405
Likes: 0
Received 8 Likes on 3 Posts
Actually crew numbers on a CVF aren't that different from a CVS due to enhanced automation. It will have a bigger bar as well.
Navaleye is offline  
Old 21st Apr 2006, 16:01
  #85 (permalink)  
 
Join Date: May 2002
Location: Downeast
Age: 75
Posts: 18,286
Received 500 Likes on 208 Posts
Along with this massive CV fleet you are talking about....where are the escort and supply vessels going to come from? You cannot rely upon the Canadians....a two ship navy is not going to be of much use to the UK as escorts.

EU becoming a super power? Now that is a joke...you cannot agree on the size of a pint of beer for crying out loud.

What the UK should do is accept third world status...declare itself a Neutral Power...and ask the French and Dutch to protect you.
SASless is offline  
Old 21st Apr 2006, 16:59
  #86 (permalink)  
mlc
 
Join Date: Mar 2006
Location: Midlands
Age: 55
Posts: 181
Likes: 0
Received 0 Likes on 0 Posts
Invincible has already been withdrawn from service. A still serving friend of mine said she was in quite a poor state when she went.
mlc is offline  
Old 21st Apr 2006, 17:37
  #87 (permalink)  
Suspicion breeds confidence
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,405
Likes: 0
Received 8 Likes on 3 Posts
She's been decommisioned and placed at readiness 5. I've not heard about her being in a poor state. She did have a £30m refit just two years previously. Invincible was the hardest worked in their early years, Ark the least (living up to her forebear's nickname of Park Royal).
Navaleye is offline  
Old 21st Apr 2006, 18:03
  #88 (permalink)  
 
Join Date: Dec 2004
Location: here, there and everywhere
Posts: 51
Likes: 0
Received 0 Likes on 0 Posts
Unhappy

Despite being old, I would rather "cruise" on a CVS any day, rather than spend 5 mins on the "O" boat. Its rather concerning being light blue and having more time afloat than some of the Fleet Air Arm
ramp_up is offline  
Old 21st Apr 2006, 18:30
  #89 (permalink)  
 
Join Date: Mar 2006
Location: Cosford
Posts: 60
Likes: 0
Received 0 Likes on 0 Posts
Sorry boys this discussion is now ilrelevent. So much dosh has been spent sorting out Mrs B liars hair that all future military spending is cancelled.
Dogfish is offline  
Old 23rd Apr 2006, 09:26
  #90 (permalink)  
Thread Starter
 
Join Date: Feb 2002
Location: Devon
Posts: 2,811
Received 19 Likes on 15 Posts
In an earlier post, FF said:

And where is the Carriers AAR support going to fly from? E3Ds? ASTOR? R1s etc?

Carrierborne aircraft will need less tanker support due to being nearer to the area of operations. I'm sure I've read somewhere that FSTA will cost more than CVF, which is incredible! But since you've mentioned it, why not convert some F35s to act as "buddy buddy" tankers? In the old days weren't some Buccs used in an AAR role?

MASC will provide many of the capabilities of the E3D and ASTOR. As for R1 (I assume you mean the Nimrod R1) you may have a point, but there are platforms other than aircraft that can perform an ELINT role.

CVF is absolutely critical to the Navy's Strategic Plan(s).

So is MASC, which does not appear to get the attention it deserves. In the last few years the fleet has been cut a lot, and one of the assurances given by Ministers was that "due to increased interconnectivity.........blah blah blah". But without excellent sensors this will count for nothing. The more capable MASC is the more capable the Fleet and Joint Forces operating with it will be.
WE Branch Fanatic is offline  
Old 23rd Apr 2006, 23:14
  #91 (permalink)  
 
Join Date: Sep 2004
Location: Stoke
Posts: 112
Likes: 0
Received 0 Likes on 0 Posts
I thought that early Buccaneers (pre-spey) couldn't get off the deck with weapons and fuel so the navy used Scimitars with buddy packs to refuel the Buccs once they were airborne
Anyway, back to the cvs debate. . .
Pureteenlard is offline  
Old 24th Apr 2006, 04:08
  #92 (permalink)  
 
Join Date: Apr 2001
Location: surfing, watching for sharks
Posts: 4,076
Received 53 Likes on 33 Posts
"All it needs is to further intergrate and its there"

How 'bout starting with a common currency? The EU will fracture or stay in its current transitional form rather than present itself as a counter weight to the US. Not that there are that many US lovers, as there are far too many differing strategic goals to allow a homogenous foreign policy to succeed.
West Coast is offline  
Old 25th Apr 2006, 14:38
  #93 (permalink)  
Thread Starter
 
Join Date: Feb 2002
Location: Devon
Posts: 2,811
Received 19 Likes on 15 Posts
We need to start cutting steel and doing the hundreds/thousands of other things that need to be done - much of this will use the same technology as the Type 45 Destroyer.

Surely getting the construction of the hull modules should start NOW, why do the Government insist that every decision about the outfitting (CTOL vs STOVL for instance) before work can start?
WE Branch Fanatic is offline  
Old 25th Apr 2006, 16:28
  #94 (permalink)  
 
Join Date: Feb 2005
Location: Rural Somerset
Posts: 154
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by WE Branch Fanatic
I understand that the reason that it was decided to order three CVS back in the '70s was because it was assumed one would be in refit etc.......leaving two at varying states of readiness. Times have changed, and modern maintenance and condition monitoring should mean these vessels spend relatively little time in upkeep.
Therefore two will suffice.
Times have changed???????????

Have you ever been in a CVS in EDAMP lately?

Gone are the days when a crate for the dockies could get you some "extra" jobs done! Indeed I would say your assumptions demand we need more than 2!!!!! DML = Dockyard Matey Limited!!

Whilst I am at it...............as a WE fanatic........please tell me what the WE Branch actually do. In LUSTY we were over ran by them.....the most embarassing sight I ever saw was the then WEO saluting as the Sea Dart launcher was hoisted off the ship........pitiful to say the least!

If you ant to be a fanatic.....how about FAA fanatic..............??
Strictly Jungly is offline  
Old 25th Apr 2006, 22:41
  #95 (permalink)  
Suspicion breeds confidence
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,405
Likes: 0
Received 8 Likes on 3 Posts
Don't be too hard on him Jungly, a working Sea Dart system and an obliging target beats a video game any day.
Navaleye is offline  
Old 26th Apr 2006, 10:38
  #96 (permalink)  
 
Join Date: Dec 2003
Location: YES
Posts: 779
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by WE Branch Fanatic
We need to start cutting steel and doing the hundreds/thousands of other things that need to be done - much of this will use the same technology as the Type 45 Destroyer.
Surely getting the construction of the hull modules should start NOW, why do the Government insist that every decision about the outfitting (CTOL vs STOVL for instance) before work can start?
Yes we do but then we are comitted to the programme and Brown can't cut it to save money at a later date. I will be very surprised if CV ever see water. The RN will probably end up as a flotilla of Type 45's, 3 ssk(n), some minehunters, 3 survey vessels, 4 patrol boats and the amphib fleet. As sea power will be seen as irrelevant in a modern world and not fitting with Brown Labour world view. I think the only thing likley to save them is them being built in the New Prime Ministers backyard.
NURSE is offline  
Old 26th Apr 2006, 18:42
  #97 (permalink)  
 
Join Date: Apr 2006
Location: St Omer
Posts: 2
Likes: 0
Received 0 Likes on 0 Posts
Marinised (or Marinated) Typhoon?

Not sure if anyone's thrown this into the debate yet but...

JSF:

1) Technology transfer issues (US angst over EU military sales to China?)
2) Budget overruns (approx. 15% and climbing)
3) Programme delays (CVF ~ 2012, JSF ~ 2015)
4) US budget constraints (build F22, JSF CTOL (USAF) and JSF CV (USN), but cancel JSF STOVL(USMC))

Typhoon:

1) Don't want to buy 232 but probably have to (contractual penalties)
2) Tranche 3 = 90 aircraft (design not frozen)
3) Maritime variant of Typhoon currently being scoped by Industry (strengthened mainspar, landing gear and hook etc.).

If we have to buy 'em, we might as well use 'em . . .

. . .don't you think?

Auchtung Shitflyer is offline  
Old 27th Apr 2006, 15:55
  #98 (permalink)  
 
Join Date: Oct 2004
Location: somewhere between the gutter and the stars
Age: 39
Posts: 38
Likes: 0
Received 0 Likes on 0 Posts
Achtung, my dear boy. Your plan unfortunatley has two major flaws.
The first, is that it appears to be cost effective, and the second, and by far most important is that it makes some sort of sence. The powers that be will never consider it due to those two points.

Fly Navy.
maccer82 is offline  
Old 27th Apr 2006, 19:41
  #99 (permalink)  
 
Join Date: Apr 2006
Location: St Omer
Posts: 2
Likes: 0
Received 0 Likes on 0 Posts
maccer82,

(Christ! I've misspelt Achtung haven't I? Ze humiliation . . .)

You are probably right. I am not Navy but I am a fan of CVF. Losing JSF might be a bit of a capability disaster, but it's going to cost ~10Bn and why do we need Stealth anyway? Surely we're not crazy enough to take on a technically advanced enemy without our US friends, who can use their stealthy jets to get us an invite to the party. OK, so we'll have to sit on the touchline with the half-time oranges and the fat, wheezy boys with a note from Matron . . . but only for a few weeks. Completing/converting the Typhoon purchase might cost (say) 5Bn leaving a tidy lump sum that could be used to complete CVF (and a few other programmes) to spec. You'd also save all the cash that would need to be spent in order to run two fleets . . . training, spares, weapons etc.

Of course, all this assumes that Typhoon can be converted for Maritime ops . . .

AS

(call me ouch-tongue)
Auchtung Shitflyer is offline  
Old 27th Apr 2006, 20:25
  #100 (permalink)  
 
Join Date: Oct 2004
Location: somewhere between the gutter and the stars
Age: 39
Posts: 38
Likes: 0
Received 0 Likes on 0 Posts
The whole idea of the stealth on the aircraft is for a 'first day of war scenario' after that pylons will probably be fitted to give it a better payload anyway, and in the process buggering up the stealth characteristics. Why don't we leave this first day of war sneaky beaky business to the yanks and we can jump in with aircraft with decent payloads (Typhoon) at a later date? Anything can be navalised if you throw enough money at it
maccer82 is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.