PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Australia, New Zealand & the Pacific (https://www.pprune.org/australia-new-zealand-pacific-90/)
-   -   Virgin A320 issue (https://www.pprune.org/australia-new-zealand-pacific/567996-virgin-a320-issue.html)

TBM-Legend 20th Sep 2015 11:28

Virgin A320 issue
 
What happened here?


https://www.flightglobal.com/news/ar...ol-inc-416727/

Compylot 20th Sep 2015 12:25

Well... if you click on the link it says


The flight crew reported that an automated flight system issue had occurred, and elected to return to Perth,”
Do I need to add a 'rolls eyes' emoticon?

Or mention that it was perhaps the Thronomister?

Or berate the standard of journalists reporting on such a trivial matter?

Or tell everyone to perhaps "Wait for the report"

...and then sarcastically whinge that it will take three years for it to come out.

But it's OK to speculate because that's what us professionals does!










(So, anyone have any idea what happened?)

PoppaJo 21st Sep 2015 10:36

Oldest A320 operating in this part of the world, 93' build.

Probaly has a bit to do with it, seems to be tech a fair bit..

Ollie Onion 21st Sep 2015 22:06

I flew this one in a previous life and it was an old piece of crap then, I am astounded it is still flying. When I was flying it Airbus was paying my airline to keep it in the air as they are using it as a test airframe for airframe life.

wheels_down 24th Sep 2015 01:39

Virgin is the 36th User of this particular aircraft!

It was even with Virgin Atlantic in the early 90's

Buttscratcher 24th Sep 2015 05:02

......reminds me of this girl I knew

tail wheel 24th Sep 2015 05:16

Been around a bit!!!

Virgin Australia Regional Airlines VH-FNP (Airbus A320 - MSN 429) (Ex C-GTDM D-ASSR EI-TLE ) | Airfleets aviation

Dec12 24th Sep 2015 05:41

Virgin A320 Issue
 
Having been involved with this aircraft from very early on in it's life, I would like to provide a clarification if I may. While Airfleets shows that the aircraft has had 36 operators this is not completely correct. The aircraft has operated for 36 Airlines while under the control of two airlines from both an operational and maintenance perspective. The first was Transaer from 1993 to 1999 and the second was Airtours which through takeovers and mergers became part of the Thomas Cook group from 2000 to 2010. During the period from 1993 to 2010 the aircraft was fully controlled by these particular airlines on their respective AOC's and Maintenance programs.

Transition Layer 24th Sep 2015 12:59

So to sum up, only 2 pimps but 36 clients?

troppo 24th Sep 2015 13:31

TL...wittiest comment of the year award :D

josephfeatherweight 24th Sep 2015 14:11

Very good! :D

theozguru 4th Oct 2015 10:23

Cheap lease rates. I am sure they did a deal somewhere along the lines.

fruitloop 4th Oct 2015 23:46

Havn't seen it for a long time so just wondering "did they ever replace the left hand engine Thrust recovery nozzle ??

criticalmass 6th Oct 2015 02:06

They probably did, about the time they installed the MK36B Thronomister, replaced the Blue hydraulic system back-flush reverse-linkage arm and overhauled the Power Transfer Unit Noise-Amplifier. :E

cavemanzk 10th Oct 2015 04:18

Maybe if they really need A320s to operate some of their western regional routes, they could pick up some ex NZ 320s? OJA will be looking for an new home once the NEO come.

ACMS 10th Oct 2015 06:28

Sold.........

Chris2303 10th Oct 2015 09:14

Who purchased them?

ACMS 10th Oct 2015 09:38

Read this link I found, since then they've offloaded the last ones as well.
Don't know who bought them.

Jetstar Hong Kong Sells More of Its Fleet to Cut Costs - WSJ

PoppaJo 11th Oct 2015 22:29

They all went to Chinese and Hong Kong carriers.

WingNut60 4th Mar 2019 23:37


Originally Posted by Compylot (Post 9122983)
Well... if you click on the link it says

.............Or tell everyone to perhaps "Wait for the report"

...and then sarcastically whinge that it will take three years for it to come out.

Never mind three years .... the final report ( AO-2015-107) is now in Final Approval phase and due for Dissemination this quarter.
Current information infers that this could be worth reading.


The ATSB recognises the extended timeframe of this investigation. Together with other internal resourcing factors and safety priorities, it has taken significantly longer to complete the investigation to a level commensurate with the complexity and importance of the safety factors identified.





All times are GMT. The time now is 12:02.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.