PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Australia, New Zealand & the Pacific (https://www.pprune.org/australia-new-zealand-pacific-90/)
-   -   syd sio engineering to loose j* (https://www.pprune.org/australia-new-zealand-pacific/424009-syd-sio-engineering-loose-j.html)

griffin one 13th Aug 2010 09:43

syd sio engineering to loose j*
 
rumors have it syd sio will loose j* engineering contract. Apparently going self handling.looks like the ex emirate engineers now on j* payroll

Bumpfoh 13th Aug 2010 11:47

And the moment something goes remotely wrong they will come crying for help.

To them I say good luck but you can't have your cake and eat it too.:=

hadagutfull 13th Aug 2010 19:03

Yep... just another nail in the SIO coffin.....

What does the strategy map say to do now???

chockchucker 13th Aug 2010 21:09

Think you'll find it's not just Sydney but nation wide that Jetstar will be taking over J* A330 maintenance.

division1 13th Aug 2010 22:31

Good luck to the Jetstar lames, at least they picked up the work.
QF would have loved it go to the shonkiest operators in town,
the IASA debacle at OOL was the proof of that.

MyerFlyer 14th Aug 2010 05:16

QF will still do the heavy checks on JQ A332s in BNE.

Bolty McBolt 15th Aug 2010 07:51


just another nail in the SIO coffin.....
That must really effect the required head count at SIO. :mad:


Rumour has it Jet* had 300 applications for the Engineering ramp jobs to cover the A330s on the east Coast. :ouch: One has to wonder where these 300 are now?


What does the strategy map say to do now???
Not sure, Was the "bridge of trust" ever built to leave pity city ?

Is the Strategy Map garbage is being regurgitated at Vincent's new place of employ.

hewlett 15th Aug 2010 09:48

Surprise,surprise! Buggery continues.

Clipped 15th Aug 2010 10:10

I'm very disappointed at the level of engagement here.

Need to keep surveying until we get the slightest hint of a turn around.

griffin one 17th Aug 2010 19:34

J* is nothing more than a tumor bleeding qf dry and introducing workchoices on an unpredecent level.
keep cutting t&c,s guys.
soon the white tail rat will do syd/lax
syd/lhr
sio is slowly bleeding to death while the henchmen offer bandaids

lamem 18th Aug 2010 07:45

Eventually we will all change uniform. Some have seen the light and already gone. They will bleed the mighty red rat dry to breastfeed the screaming baby.
Will heavy relinguish line in Vic/Tas and Qld and allow it to return to line management where they belong or run them down under HM mismanagement. the rumour is out there of a return but does it have any substance.

lamem 2nd Sep 2010 10:12

Guess that was answered yesterday. Watch for the next readjustments.

chockchucker 2nd Sep 2010 11:14


Guess that was answered yesterday. Watch for the next readjustments.

Can you be any more specific? Are Heavy and Line now separated again?

crwjerk 2nd Sep 2010 14:18

It's LOSE, for ****'s sake. How many times do we have to "LOSE/LOOSE" police.????

SeldomFixit 3rd Sep 2010 02:09

Only as long as you feel a need to persue it would be my guess crwjerk - most people just get over it.:cool:

lamem 3rd Sep 2010 10:13

Line back under young harris, heavy under keith. The BNE kiwi connection won't be happy. Their empitr is gone. Head of supply no longer of assistance to the company. DH now head of supply.

chockchucker 3rd Sep 2010 11:05

.........And what becomes of Mr. Brown (Exec GM of the singular Line/Heavy organisation in Vic/Tas)?

rmm 3rd Sep 2010 11:06


heavy under keith. The BNE kiwi connection won't be happy.
Didn't he put them there too begin with? Although no one would loose any sleep if those two were shown the door.

18-Wheeler 4th Sep 2010 02:49


rumors have it syd sio will loose j* engineering contract.
I hate it when things get to loose.

hadagutfull 4th Sep 2010 06:11

Is the management gene pool really that shallow in engineering?? We just keep getting all these position changes using the same deck of cards.....

And what of Mr Clarkes big plans that were splashed out there during all these feedback meetings like integration of 380, customer contracts for line, more overflow work for base?? All out the window now that there are so many fingers back in the pie??

I see the level of communication between management and the workforce is still lacking some what....

I guess nothing going to happen till the EBA is sorted.... not a lot of info on that front either.......


All times are GMT. The time now is 22:02.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.