Old 12th Aug 2019, 19:48
  #221 (permalink)  
Thread Starter
 
Join Date: Aug 2004
Location: melbourne
Age: 58
Posts: 1,103
Received 70 Likes on 36 Posts
On November 20th, 2018, CASA provide me with the “inspection” notes from the audit done at Latrobe Valley on September 3rd 2018.

Please note that these audit results came in 2 ½ months after the audit.

That timeline will become integral, and in my opinion clearly demonstrate clear breaches of Administrative Law, Natural Justice, and Procedural Fairness.

This post will also highlight significant deficiencies in the ICC process.

03/09/18. CASA visit Latrobe Valley (one of our bases). CASA identify minor anomalies only with the exam. We are told a written report will follow. CASA procedures require this. Those procedures all identify that “no new items” should be raised in the written report that follows, if they were not identified on the day i.e. no unexpected surprises.

16/11/18. I attended the CASA office. The Regional Manager began giving me a verbal debrief summary of Latrobe Valley Aerodrome audit results. This time he raised completely new concerns. These were inaccurate claims and different to what I had previously been informed. It was then identified by the Regional Manager that in fact an audit report had not been completed, and he would get it to me by the following Tuesday, which he did.

For clarity. We had an audit conducted on 03/09/18, then on 16/11/18 it is identified by CASA that an audit report was not done, and that it would be.

A few days later on the 20/11/18 the newly “minted” audit results have been prepared over the weekend and now arrive.

Recall, that these are now being written more than two months after the audit. Surprisingly the Regional Manager advises me in the accompanying email, that the Latrobe Valley audit results were “used as the basis of seeking CASA legal advice”. Well that leads me to some obvious questions.

If the Regional Manager admits that audit results were not produced until after our meeting on 16/11/18 (Friday), he writes to me on the following Tuesday stating they were “used as the basis of seeking CASA legal advice”. The legal department couldn’t possibly have used the audit results because they had not been created yet!!!!!!

That statement cannot possibly be truthful!

Interestingly, these newly minted audit results have allegations of breaches of
· CASR 141.310 (1),(5), and (6)
· CASR 142.390 (1),(5), and (6)
· CASR 117· CASR 141.260 (g)
· CASR 142.340 (g)

The ICC seemed to brush these matters aside. I specifically identified to the ICC that CASA made allegations of regulatory breaches and the Regional Manager required me to respond. I will contain excerpts of associated emails. The point of these emails is that they clearly demonstrate I was required to respond to an allegation of a regulatory breach as I am.

“Good afternoon Glen,

Please excuse me for any confusion that you may have, but CASA is waiting for you to reply to those matters that were provided in my email to you dated 20th Nov 18 (copy attached again for your reference)

At the meeting with Mr Peter White - CASA Executive Manager Regulatory Services and Surveillance on Friday 16th November 18, it was established that I would provide you the feedback from the CASA assessment of the Latrobe Valley training base, and it was further agreed that this assessment information would be reviewed by yourself, and that you would provide your response to all of the issues identified. Once we received your response, we would resubmit the information to our CASA legal team for a second review ………….



Then again from the Regional Manager a few days later;

“Hi Glen,

This is just a follow-up email requesting your assistance to provide CASA a reply to the information I supplied you last Tuesday 20th November 18 (please see attached).

May I please seek some assurance that you will be able to provide CASA your feedback against the Latrobe Valley Aero Club training base inspection results, in a timely manner. It is respectfully requested that you provide this feedback to CASA by close-of-business on Tuesday 4th December 18, as this equates to a period of 14-days since the information was sent to you.

As you will recall, it was agreed at the 4th December 18 meeting between APTA and CASA that following the receipt of your reply to the Latrobe Valley Aero Club inspection information, we would request another review of the relevant information by the CASA legal team to ascertain if there is any change against the original determination that APTA is a franchised arrangement. I look forward to your reply.

Kind regards,

Those above emails clearly indicate that I am clearly required to respond to the allegations of regulatory breaches.

I will clearly indicate in following posts how the Regional Manager ignored and frustrated my attempts to resolve these issues over many months,

The reason. The allegations were not correct, and to this day after more than 9 months despite over 30 requests for assistance which I will document, CASA cannot support or justify any of the new allegations that arose. Furthermore and interestingly the notes provided on the audit were not dated. It was almost as though CASA was trying to hide this clear breach of administrative law.

28/11/18 the Regional Manager writes “ a level 2 surveillance event was created in our system”, yet the ICC says in his Preliminary report dated 12/04/19 “theres no record of the documents I would expect to see if a Level 2 had been commenced in CASAs Sky Sentinel surveillance databaseLater, CASA tried to reverse the position and called it a surveillance event rather than an audt. The ICC claims that it was a surveillance event, and that’s why he chose to avoid addressing my complaint in my final ICC report.

My point, the changing terminology for the event is irrelevant. My complaint was not about the terminology used, it was clearly about CASA frustrating my attempts at a resolution, and prolonging the impact of the damage caused by CASA actions.Overall, an audit or “event” that is surrounded by significant, repeated, and sustained breaches of procedures. Why? Because the named personnel in CASA made a decision to act this way. Its not an error or an omission. It is a deliberate attempt to frustrate fair processes.
glenb is offline  
Old 12th Aug 2019, 20:39
  #222 (permalink)  
Thread Starter
 
Join Date: Aug 2004
Location: melbourne
Age: 58
Posts: 1,103
Received 70 Likes on 36 Posts
CASA frustrating my attempts to resolve

Importantly CASA made a number of allegations of breaches.

The accusation of CASR 117 was particularly concerning, as it relates to misrepresenting your organisations capabilities.

A serious breach. CASA raised this allegation against me. The CASA allegation placed a serious restriction on my trade, and prevented me from marketing my product.

I was in a situation where I believed CASA was wrong. I made many attempts to resolve this issue over manty many months as you will see. This was typical of my dealings, and my requests were completely ignored. There can be no doubt that CASA raised the allegations, CASA clearly required me to respond. It was the CASA personnel that DECIDED not to respond and allow me to become compliant again.

This is an important piece of information that the ICC decided not to address. t was listed as one of my complaints, but masterfully avoided. Whilst I have not included all of the emails, it does clearly demonstrate unacceptable behaver by those CASA personnel.


28/11/18

CASR 117. I have visited the Latrobe Valley Website and cannot identify the breach. Could you please provide information on specifically which part of the website is causing the regulatory breach, perhaps a link to the relevant page.

05/12/18

In regards to our alleged breach of CASR 117, I have visited the Latrobe Valley website and cannot identify the breach. As per my request submitted to you on 28/11/18 can I make a second request to have the offending link sent through to me, so I can satisfactorily address the breach.

10/12/18

Similarly with CASR 117. I have reviewed CASR 117, and I do understand the regulation but I am having difficulty in responding, as I cant see the “offending:” page on the LTV website. Perhaps a link could be sent through to me and I will attend to that immediately.


07/01/19

Dear Mr Jones, I thought I would take the opportunity to remind you to attend to this. One month ago, you advised that you would respond. My experience dealing with you is that you consistently deflect or do not respond. My request is fair and reasonable and your consistent failure to respond and assist me to finalise this matter is unethical and brings unnecessary continuing harm to my business. Repeated and consistent requests have been made. I am very strongly of the opinion that you are deliberately frustrating my efforts. There can be no other explanation as my request is entirely reasonable. Can you please clearly address my queries, by the end of the day. You have obligations placed on you by the PGPA Act, and I call on you to act professionally and act in accordance with those obligations. Failing an answer to my questions, I will have no option but to initiate a further ICC complaint about the approach that you have chosen to adopt with my business.

Glen



04/04/19


The purpose of this letter is to ascertain the status of the alleged breach of CASR 117 made by CASA against APTA. I am hoping that the variations to our operating conditions will be soon lifted. I want to ensure there are no outstanding concerns that could delay this.

17/05/19

Dear Owen/Jason,

On 3rd September 2018, CASA conducted an audit at Latrobe Valley. The verbal debrief on site on the day identified some suggestions regarding our exams, and those suggestions were immediately embedded. No other concerns were raised.

Then at a subsequent meeting with CASA new allegations regarding Latrobe Valley “forms” was raised by the Regional Manager. This differed to the verbal debrief on the day of the audit. CASA further identified that unfortunately the audit results had not been provided to APTA. Months after the audit, notes were finally presented. They were not dated and obviously written up months after the audit was conducted. The new allegations of breaches appeared for the first time. These results differed entirely to the exit interview, and the meeting in the CASA office with the executive manager and Regional Manager then emerged for the first time, and no mention had been made prior. These “newly written” audit results now claimed breaches of
CASR 141.310 (1)

CASR 141.310 (5)

CASR 141.310 (6)

CASR 142.390 (1)

CASR 142.390 (5)

CASR 142.390 (6)

CASR 117

CASR 141.260 (g)

142.340 (g)

Flight and Duty exceedances.

I have made repeated and well documented attempts to resolve these allegations, and CASA has chosen not to respond. As you are aware CASA have varied by AOC and reduced the date of approval. It is critical that I resolve this matter, as the commercial impact is significant, as I have outlined previously. CASA is working on its requirements in the contracts for more than 7 months now, and there is nothing that I can do from that side. My concern is that once CASA finalise the contractual requirements, these allegations will reappear and further impact on my business, by delaying our start.
Could you please clarify which of the allegations I need to attend to, and which ones can be withdrawn. You will appreciate that I am obligated to resolve these matters, and that is my only intention. I encourage CASA to assist me by providing guidance. Thanking you in anticipation of your assistance, Respectfully, Glen Buckley


21/05/19


Dear Mr McHeyzer,

Could I respectfully request clarification of the status of the allegations of regulatory breaches made by CASA.

Respectfully, Glen







21/05/19 Email to Mr Crawford

I have made repeated and well documented attempts to resolve these allegations, and CASA has chosen not to respond.

As you are aware CASA have varied by AOC and reduced the date of approval. It is critical that I resolve this matter, as the commercial impact is significant, as I have outlined previously.

CASA is working on its requirements in the contracts for more than 7 months now, and there is nothing that I can do from that side. My concern is that once CASA finalise the contractual requirements, these allegations will reappear and further impact on my business, by delaying our start.
Could you please clarify which of the allegations I need to attend to, and which ones can be withdrawn. You will appreciate that I am obligated to resolve these matters, and that is my only intention. I encourage CASA to assist me by providing guidance. Thanking you in anticipation of your assistance, Respectfully, Glen Buckley

11/06/19

Dear Mr Martin,

As you are aware CASA conducted an audit of Latrobe valley. I wish to clarify an incorrect statement in the “structure review” of APTA.

CASA records will clearly indicate that in fact APTA has two CASA approved CEOs, two CASA approved HOOs (with a third on hold due to the current CASA action, and two CASA approved Safety Managers.

This is a misunderstanding on behalf of my CMT, and I would like the opportunity to clarify that.
As you are aware we submitted an application on 22/06/18 for the addition of Latrobe Valley as an APTA base.

On 03/09/18 CASA attended and conducted an audit.
It was identified that CASA had not provided the audit results and they were provided to us on 20/11/18, months after the audit. On provision of those audit results there were allegations that we were misrepresenting APTA.

Specifically I was concerned about the CASA allegation of breach CASR 117. These were entirely new allegations that we had not seen before.
As a precaution, I called a halt to our extensive advertising of APTA and that has continued on for many months.

As you will appreciate that is effectively placing a restriction on my trade. I have made multiple requests to have this resolved and none have been responded to.


I have not done an exhaustive check due time constraints although I did make the following requests in an attempt to resolve the allegation of a breach by CASA
28/11/18 Email to David Jones asking for information to attend to the CASA allegation of a regulatory breach. There was no response to my request

05/12/18 Email to David Jones. Second request. No response to my request.

10/12/18 Email to David jones. Third request. No response to my request.

11/12/18 Email to Will Nuttall requesting meeting to sort out Latrobe Valley audit results. There was no response to my request.

28/11/18 Email to David Jones. No response to my request.

07/01/19 Email to David Jones urging him to respond to my emails regarding audit findings. No response to my request.1

6/05/19 Email to Graeme Crawford.

21/05/19 Emailed to Jason McHeyzer and he advised me to contact Craig Martin.
21/05/19 Emailed Graeme Crawford.
22/05/19 Emailed to Craig Martin. No response to my request.
27/05/19 Emailed to Craig Martin. No response to my request. Craig, please, if CASA make allegations of regulatory breaches, they do impact on my business. After nearly 8 months, can you please respond to my request, to assist me to resolve the allegations made by CASA.

One finalised, that will allow me to recommence marketing.
As you can see there have been at least 12 requests. They are reasonable requests. The impact of CASAs allegations is significant, please meet your obligations and assist me to resolve this matter.

Respectfully, Glen Buckley.



13/06/19

Dear Mr Martin,

As you are aware CASA raised a number of allegations of regulatory breaches, and there have been multiple recorded attempts by me, to resolve those issues which have been completely ignored by CASA. These requests have been frequent and been made over many months. You are obligated in your role to assist me. Mr Martin, I must insist that you immediately stop frustrating my attempts to resolve these matters.The approach by CASA is totally unacceptable, and by doing so, you are preventing me access to fair processes. As I have maintained since October 2018, there are no regulatory breaches, and no safety concerns. Not one of my requests has been responded to. By refusing to assist me in resolving these matters I am of the opinion that you are deliberately frustrating my attempts to resolve these matters, and are deliberately protracting time lines. You are not acting in accordance with your obligations.The failure by you to respond, restricts me from conducting my business, which is my common law right. My strong preference is to avoid lodging a formal complaint to the ICC about your conduct, hence I will make one further attempt to receive a response in 24 hours to my fair and reasonable request Mr Martin, I call on you in your role to meet your obligations and assist me to resolve the matter. I call on you to minimise the commercial impact on me and my business to respond. I look forward to your response,


Glen
glenb is offline  
Old 13th Aug 2019, 01:42
  #223 (permalink)  
Thread Starter
 
Join Date: Aug 2004
Location: melbourne
Age: 58
Posts: 1,103
Received 70 Likes on 36 Posts
Ballina Base saga

The Ballina base saga.

The APTA team travelled to Ballina for the establishment as a temporary location.

We used the exact procedures that CASA suggested to us, provided to us, CASA approved for use by us, audited by CASA, and in fact CASA had previously used this procedures on previous bases.

In October 2018, when CMT 3 headed by Will Nuttall elected to apply a complete change of policy based on opinion only, the pilots at that base became concerned about continuing operations. I assured them our procedures were approved, but they elected not to fly, as is any pilots option if they are not comfortable.

I was concerned as the owners had made a significant investment of the belief that CASA had approved APTA (as they had), and future options would be secure, provided levels of safety and compliance remained high.

Unfortunately, once again despite my attempts to get resolution on this, CASA steadfastly refused to reply. Eventually as in my own case with MFT, the business could not sustain continuing operations and the Ballina base stopped delivering GA flight training.

The financial impact on persons who had invested in the base was significant and totally unnecessary. Whilst I don’t intend to include all the emails, I have included a sampling that clearly show CASA frustrating processes. I never received an answer, and 9 months later, still haven’t.

05/12/18

“Dear David, We had Ballina operating as a temporary location, after the entire APTA team travelled to Ballina to execute our procedures, strictly in accordance with our approved procedures.

The nature of the location is temporary as it will be awaiting CASA acceptance or rejection, and the Ballina base understands that is the procedure.

No surety of operations can be guaranteed until CASA processes are finalised.
This base elected to cease operations shortly after the initial CASA action 6 weeks ago.

There hope was that this matter would be finalised by now, although as you will appreciate it is taking somewhat of a long time to resolve.
My preference is to reactivate the base.

We followed all CASA approved procedures and I am fully satisfied that it should run as a temporary location until CASA makes a determination as to whether it will become a permanent training base.
Therefore, in order to minimise the impact on APTA can we reactivate the Ballina base with me accepting full responsibility under APTA for that operation?Cheers. Glen.”


05/12/18

“Hi Dave, Just for further clarity regarding the previous email, can you confirm that Ballina is legal to operate? Yes or no,?Cheers. Glen”



12/12/18

Dear Mr David Jones, Please distribute within CASA as required. You are the only CASA recipient.

The Ballina operation is requiring a response as to their ability to reactivate operations. I emphasise again that we strictly followed all CASA approved procedures in activating this as a temporary location. It can only be a Temporary location as CASA may veto it as they did with Ballarat and Latrobe valley. We followed all procedures, and invested heavily in the induction process. This included onsite visits to Ballina over consecutive days with attendance by CEO, HOO, GSM, Internal Co-ordinator, two supporting administrative support workers and our HOO in Training.

There has been no breach. As an APTA base, I am very strongly of the opinion that the base should be operational. I must also respect the pilots rights to only fly on operations that they are 100% comfortable with. I need to be able to assure the pilots that they are not acting in breach of any CASA legislative requirements.Ballina has advised that if this matter is not fully resolved by Friday the base will be permanently closed. Three onsite staff are affected, and the costs associated with running a base that has ceased operations is obviously not economically viable.

Your assistance in providing guidance would be greatly appreciated. I am available at any time for a face to face catch up at the CASA office if my onsite presence will assist in a mutually acceptable outcome.Cheers. Glen.


07/01/19

“Dear Mr Jones, This email query was sent through a month ago, and you have chosen not to respond. Can you please provide an estimated timeline”

20/02/19

Sadly, I received this email below from the investors in the Ballina base.

Good evening Glen, I am writing to advise that White Star Aviation, having now grounded GA Operations since November last year and having now lost all of the students we had enrolled, have made the decision to focus on RAAus operations and as such cancel our membership with APTA.
We appreciate how incredibly disruptive and damaging the action taken by CASA has been on your organisation, as it has on ours and others. I truly hope APTA and CASA find a solution to allow your other not-yet approved bases to commence/re-commence operations as soon as possible.


08/04/19

After discussions with the Ballina investors I sent the following email to CASA.

Dear Jason and Regservices, I am writing to you regarding this Regservices task. I received the email from White Star on 20/02/18. I have established contact with the Director of White Star today, as a further 6 weeks has passed, and as could be reasonably expected, the additional delay has only made their situation worse. They will not be continuing with their APTA membership, and we will remove all reference from the APTA website within 24 hours.

Could you please cancel the task.
I must point out that multiple requests were made by APTA to clarify the status of this base, and Mr Will Nuttall undertook to write to us.

Numerous written requests were sent to CASA and they were repeatedly ignored over almost 6 months, and it is important that is noted.
Respectfully, Glen.
glenb is offline  
Old 13th Aug 2019, 02:00
  #224 (permalink)  
Thread Starter
 
Join Date: Aug 2004
Location: melbourne
Age: 58
Posts: 1,103
Received 70 Likes on 36 Posts
CASA personnel looking after each other

Regarding the Ballina base.

CASA had an issue with the procedure that we adopted in activating Ballina.

The truth of the matter is that CASA personnel had absolutely no idea because they elected to shoot first, and ask questions later.

My matter was slowly being accelerated up the chain and I had the opportunity to meet with Mr Craig Martin.

As a precursor to that meeting I made a suggestion to him, which I have included below.

Had Mr Craig Martin availed himself of that opportunity I presented to him, he would have realised CASAs deficiencies back in December 2018, and I may not be dealing with this, 9 moths later. His decision not to interview the named personnel, and bring his own independent determination to the matter demonstrates to me that there was no intent to resolve this matter. Mr Martin made a decision not to avail himself of the opportunity.

Email I sent to Craig Martin below
"...…….Can I make a well intentioned suggestion that will demonstrate quite clearly to you, the deficiencies within CASA.


Ask either Mr Brad Lacey or David Jones to explain how we introduce a new base.


A good example would be to ask them to describe how we activated the Ballina base and the procedures we adopted? Who attended on site for training from APTA? How long did we stay? Did APTA personnel meet with the CAGRO for the airport? Did we meet with the fire and emergency services. Were the Prof checks conducted in Melbourne or were they conducted in Ballina and why? How we attend to the FSM training. Was our Group Safety Manager able to attend on site. Seriously Mr Martin, please ask them anything, i believe that no-one from my CMT has got absolutely any idea, and quite seriously, I mean nothing. That was done many months ago, so I would expect that they have at least some idea.
I have absolutely no intention whatsoever to ask of you what their answers are. But I would ask that you compare answers with mine.

You will have a very clear understanding of the deficiency, very quickly.

Unfortunately the misunderstandings and confusion exist within CASA, and not within my own organisation, and that is why we are in this current situation.

If you decide to ask either Brad Lacey or David Jones could I respectfully request that you give them some time to consider their response to you, and I have no concerns with you giving them a heads up today of your requirements.

Thankyou again for your approach, regards. Glen Buckley.


glenb is offline  
Old 13th Aug 2019, 04:23
  #225 (permalink)  
 
Join Date: Feb 2015
Location: Santa Barbara
Posts: 912
Likes: 0
Received 0 Likes on 0 Posts
Ho-lleeee ****!
The name is Porter is offline  
Old 13th Aug 2019, 05:06
  #226 (permalink)  
 
Join Date: Jul 2010
Location: sydney
Posts: 1,469
Likes: 0
Received 0 Likes on 0 Posts
Of all the CAsA embuggerances we've heard about over the years this one is just diabolical.
Based on Glen's experience I cannot see any doubt that CAsA is corrupt and rotten to the core.
A judicial enquiry at the very least is required, but I'm not holding my breath.
Where the hell is the media??????
thorn bird is offline  
Old 13th Aug 2019, 07:57
  #227 (permalink)  
Thread Starter
 
Join Date: Aug 2004
Location: melbourne
Age: 58
Posts: 1,103
Received 70 Likes on 36 Posts
How has CASA contributed to safety in my Organisation

..........
glenb is offline  
Old 14th Aug 2019, 04:11
  #228 (permalink)  
 
Join Date: Jan 2002
Location: australia
Posts: 1,681
Received 43 Likes on 28 Posts
How casa contributed to the demise of my operation...XXXXX..poisoned it with the connivance of a competitor company, and heaps of casa bs and lies to clients..
Corrupt and rotten to the core is right. Criminals too, some of them, just not in jail yet.
Keep beating that drum JI, JI and save GA ! Maybe
aroa is offline  
Old 14th Aug 2019, 06:44
  #229 (permalink)  
 
Join Date: Nov 2013
Location: Equatorial
Age: 51
Posts: 1,068
Received 125 Likes on 62 Posts
Truck me!!! Did they make you provide the rub and tug as well. As you have written it this is simply amazing. How can they get away with it?

Did you consider the go fund me option?

For years I’ve thought about getting my old file from them for a laugh, I gave up in the end and walked away. Think I’d enjoy a read of it some 15 years later over many beers.....

Good luck champ.

Erm don’t let them beat you down..........
Global Aviator is offline  
Old 14th Aug 2019, 07:11
  #230 (permalink)  
 
Join Date: Feb 2015
Location: Melbourne
Posts: 215
Likes: 0
Received 0 Likes on 0 Posts
Hi Glen,
I'm struggling to think of words that adequately describe what has been done to you and your business. Outrageous, disgraceful, shameful, disgusting, reprehensible, appalling....none of them seem strong enough, even with the word f**king in front of them..! If you still have the will to keep fighting (and I wouldn't blame you if you don't), then please don't give up. They can't be allowed to get away with this. There are many in the industry who will support you via a fighting fund like go fund me.

Time to take a stand everyone. You could be next.
IFEZ is offline  
Old 15th Aug 2019, 00:28
  #231 (permalink)  
 
Join Date: Aug 2019
Location: Straya
Posts: 92
Received 11 Likes on 5 Posts
Why haven’t we heard from AOPA? Surely Ben has something to say on this sorry saga!
Flaming galah is offline  
Old 15th Aug 2019, 02:15
  #232 (permalink)  
 
Join Date: Jul 2001
Location: Australia
Posts: 4,955
Likes: 0
Received 1 Like on 1 Post
Originally Posted by IFEZ
Hi Glen,
I'm struggling to think of words that adequately describe what has been done to you and your business. Outrageous, disgraceful, shameful, disgusting, reprehensible, appalling....none of them seem strong enough, even with the word f**king in front of them..! If you still have the will to keep fighting (and I wouldn't blame you if you don't), then please don't give up. They can't be allowed to get away with this. There are many in the industry who will support you via a fighting fund like go fund me.

Time to take a stand everyone. You could be next.
IFEZ,
How about "normal".
Tootle pip!!
LeadSled is offline  
Old 15th Aug 2019, 04:17
  #233 (permalink)  
 
Join Date: Jul 2010
Location: sydney
Posts: 1,469
Likes: 0
Received 0 Likes on 0 Posts
Folks, it appears Glen has written to the PM's department regarding his predicament.
If this was the USA, a few hundred thousand letters would be flying about the place to various congressmen
and senators.
This is corruption Glen is talking about and experiencing the consequences of, we Tut Tut, wring
our hands, a few good men, doing nothing. The grubs in the upper echelons of CAsA are getting paid upwards
of half a million dollars a year each to destroy our industry, we do nothing they get away with it.
I just sent my letter to the PM's office in support of Glen, we may be goats bleating in the wilderness, but the old Sinatra song
about the ram and the dam might just ring true if everyone does the same.

thorn bird is offline  
Old 15th Aug 2019, 06:39
  #234 (permalink)  
 
Join Date: Jan 1999
Location: Queensland
Posts: 2,422
Received 8 Likes on 4 Posts
What is new?

CASA has used "administrative decisions" to eliminate large numbers of GA operators over the past 30 years. CASA makes an administrative decision to suspend an AOC, claims the Act Sect 9 as a defense in the AAC, then repetitiously ignores the many Show Cause Notice responses, procrastinates and obfuscates until the target operator goes broke and out of business.

Here is an actual text book case written by retired aviation journalist Paul Phelan and published in Australian Flying magazine, although in this instance the operator, whilst mortally wounded, won their AOC back and something of an apology:

Case to Answer?

By Paul Phelan

CASA will do all it can to ensure that a person whose licence, certificate or authority is suspended or cancelled has ready access to full external merits review in the AAT. Once before the AA T, CASA will conduct itself as a model litigant" CASA, in a document entitled: "A new approach to enforcement".

March, 1989.
"Anyone other than Dick Smith who joins CASA, becomes “infallible." DICK SMITH.

August 1998. "That's the way the system works. They think: "We are powerful and we are totally unaccountable." DICK SMITH.


When he made those comments, Dick Smith had already found the battle against authoritarian, intransigent and what he has sometimes called `incompetent' bureaucracy, tougher going than he had expected. Recent events in the Torres Strait show how much further there is to go. This incident is not the first in which CASA has used its administrative procedures to create a situation in which an operator has faced impossible financial burdens, while totally sidestepping the accountability Smith has fought for.The fatal crash of another Britten-Norman Islander in April 1996 resulted in the immediate suspension of another AOC and forced that operator out of business. The final BASI finding was not one which supported that outcome. Anyone contemplating investment or a career in aviation, should read this and study its implications. There's still hope for the industry, but a lot of things have to be fixed first, and the industry is wondering whether the right people and motivations are in place to fix them.Many of these documents would never have surfaced, had an operator not dug its heels in and fought for their release. Uzu's friends, as well as many of its commercial rivals, are united in the belief that these events represent an ongoing threat to the orderly conduct of aviation, and ultimately a negative impact on air safety. They also believe that CASA has developed a tactic to subvert the Administrative Appeals Tribunal process, by cynically sheltering behind Section 9 of the Civil Aviation Act.A CASA public relations officer recently told Australian Flying, when we queried the fairness of the procedure which an administrative decision of one individual can put a company out of business: "Well, that's the decision we have made. If (the victim) doesn't like it, he can appeal to the AAT, can't he?” When this went to press, another victim of this affair, the L.A.M.E licence of the chief engineer of Uzu's engineering company, had been cancelled. That engineer, one of the best-respected in the industry, simply cannot afford the process, especially if the AAT is likely to accept a bald CASA statement it is acting within its `safety responsibility.’

Jul 96 to Dec 98:

Uzu Air's general manager wrote 13 letters to CASA and its predecessors, seeking clarification of the anomalies surrounding the carriage of individual paying passengers at fixed fares on subsidised remote area mail service flights. None were answered, and a CASA officer later told Uzu: "Officially they don't exist."

14 Aug 96:

A CASA safety systems assessment profile report on the company then employing Uzu's general manager noted: "The company management has spent a considerable time trying to clarify the status of its Australia Post mail services, which appear to have been in non-compliance since the repeal of CAR 203. ... CASA must address the operation of vital rural mail services to remote communities and draft appropriate legislation to allow their continued operation. ... [the company] endeavour to conduct their operation in accordance with regulatory requirements. However they feel frustrated by the lack of appropriate legislation and CASA's reluctance or inability to allow regular passenger/mail services into non-surveyed landing strips or operation of single-engine IFR aircraft on such services."

4-6 Nov 97:

A periodic inspection is conducted by an FOI from Cairns District. The officer's report, subsequently obtained only at the direction of the Administrative Appeals Tribunal, says: "20 NCNs in total!" (exclamation mark as in the report.) The report added that: "This is no longer a compliant operator."

17-20 Nov 97:

Uzu is visited by an unannounced team headed by the Manager, Safety Audits, Southeast Region.The four-man team conduct a four-day audit over 52 man-hours, which results in the issue of four NCNs. Three of these detailed minor errors in maintenance documentation, and one questioned dangerous goods acceptance procedures. The report concluded: "Uzu Air are considered not to be an unsafe operator."

1-4 Dec 97:

At the direction of CASA's Canberra office, two investigators and one Cairns FOI conduct an investigation with the following terms of reference: "Determine the extent of operations in the Torres Strait region which are being conducted for fare paying passengers that fall into the definition of RPT and which are currently being conducted as charter." The TOR directed that: "The differentiation between RPT and charter that is to be used for this investigation shall be drawn from the "draft" paper prepared by (a CASA lawyer) as attached."The draft opinion, later obtained by Uzu, attempted to define the five elements which must exist to constitute RPT. However it provided no definitions of two of the critical elements: "Specific route" and "fixed terminal".The investigators had thus been instructed to investigate whether operators were in breach not of a regulation or rule, but of a draft opinion, which failed to provide critical definitions.

7 Jan 99:

CASA issues a notification of proposed action to suspend or cancel the AOCs of four operators including Uzu. The notification summarised the reasons CASA believed the companies were undertaking unauthorised RPT flights, contrary to the Civil Aviation Act. Uzu's notification also resurrected a number of NCNs issued over the previous two years, all of which had previously been acquitted.

16 Jan 99:

Uzu Air's Britten Norman Islander is involved in a fatal accident at Coconut Island. (refer http://www.atsb.gov.au/aviation/occurs/occurs_detail.cfm?ID=171 )

17 Jan 99:

An "Immediate Safety Report", outlines the few known circumstances of the accident, and states under recommended action: "DFOM (District Flying Operations Manager) to now recommend 28 day suspension of AOC." The report, faxed to Canberra at 10.55 am, on that day (a Sunday), does not state any reason for the recommendation.(CASA now claims: "This recommendation was made on the advice of BASI who clearly indicated that the left hand engine was not developing significant power at the time of impact, a view they still hold." BASI says this is untrue.)

19 Jan 99:

BASI, insurer and operator representatives fly to accident site. In a faxed message, CASA suspends Uzu Air's AOC for 28 days, with effect from 2359 that night.

20 Jan 99:

Uzu files a notice of application for review of the CASA decision to suspend its AOC, claiming that the Authority had acted ultra vires (outside its legislated authority); breached rules of procedural fairness and natural justice; failed to provide adequate reasons for the decision; misapplied administrative principles, and "failed to correctly interpret and apply the law".

22 Jan 99:

Uzu lodges a detailed 127-page response to CASA's notice of the show cause.The response was never acknowledged. At the same time, the operator attends the first hearing on the matter in the Administrative Appeals Tribunal, (AAT) seeking a stay of its AOC suspension. CASA is successful in having the stay denied. CASA's use in such stay proceedings of Section 9A of the Civil Aviation Act, appears to question the ability of any operator to gain a stay. (Look it up!). The operator believes the AAT's effectiveness in reviewing administrative processes may be neutered by this tactic. Uzu would have to wait for the 28 day suspension to expire, before being able to proceed to a substantive hearing. Uzu seeks an order from the AAT to require CASA to produce specified documents such as CASA Audit Reports, related to its decision. The AAT refuses to issue a stay order, instructs that the hearing is to be expedited, and orders CASA to provide the documents within one week or as soon thereafter as is possible. A telephone conference is then to be held to arrange the hearing. (The documents were made available about 10 days later. The 13 letters seeking clarification of RPT/charter status were not included in the documents.)

22 Jan 99:

BASI investigators recover engines from the Islander and return to Cairns. BASI holds meeting at CASA Cairns with CASA AWI. BASI advises CASA the left engine did not appear to be developing power at impact and the fuel mixture control rod was found to be broken at the accident site, but advises the component will require metallurgical examination to determine cause and time of breakage.

26 Jan 99:

Uzu Air lodges a 40-page response to CASA's AOC suspension.

27 Jan 99:

BASI advises Uzu and CASA that laboratory analysis verifies the fuel mixture control rod failed "... due to overload as a result on impact forces".

2 Feb 99:

BASI strips down left engine at Archerfield. Following day, BASI advises all interested parties of the outcome of the engine strip down.

4 Feb 99:

CASA serves a Notice to Show Cause on Uzu Air's associated company, Tamco Engineering, and asserts that BASI investigations "resulted in a finding of a disconnected mixture control rod on the left engine, which was not delivering power prior to time of aircraft impact, and was considered by these BASI Investigators to be a contributing factor to the loss of control of the aircraft prior to that impact. The subject mixture control was found to have suffered failure which exhibited severe corrosion of the mixture control ball end connection." BASI Investigator verbally denies the assertions were ever made and advises BASI was lodging a protest with CASA regarding the allegations.

Last edited by Torres; 15th Aug 2019 at 06:53.
Torres is offline  
Old 15th Aug 2019, 06:45
  #235 (permalink)  
 
Join Date: Jan 1999
Location: Queensland
Posts: 2,422
Received 8 Likes on 4 Posts
8 Feb 99:
Uzu Air holds an informal conference in Cairns with the CASA regional manager, the acting DFOM, and the assigned FOI. Uzu made a proposal that it implement check and training and Class A aircraft maintenance, immediately upon reinstatement of the AOC. The company believed this met with CASA approval. (CASA now says: "CASA's requirement is that UZU has a class A maintenance system and appropriate training and checking in place prior to the reissue of the AOC." That is not the recollection of, the Uzu representatives.

(Torres note: It is not possible to have a CASA approved Training & Checking system and approved System of Maintenance in a suspended AOC, which CASA was aware of!)


12 Feb 99:
Deputy Director, BASI, faxes BASI Preliminary Report to Uzu Air. Also faxes Preliminary Report to General Manager, Aviation Safety Branch, CASA, Canberra. Also telephoned CASA Canberra to confirm CASA's receipt of the Report. The report stated inter alia: "Examination of the left engine, while still in the wreckage at the accident site, revealed the linkage between the mixture control cable on the carburettor had failed. Subsequent metallurgical examination of these components confirmed that failure was due to overload as a result of impact forces, and that it had not contributed to the accident."

15 Feb 99:
CASA suspends Uzu Air's AOC for a further 28 days and asserts inter alia: "The Bureau of Air Safety Investigation (BASI) has been investigating the crash but has not published a preliminary or final report on its causes."

17 Feb 99:
The Cairns Post newspaper publishes an article headed "Crash report rocks CASA," (by this writer) detailing the conflict between CASA's allegations and those of the preliminary BASI report. A fax letter is received on the same morning from Assistant Director, CASA, Canberra, saying: "I have now been made aware of the content of a preliminary report of the accident by BASI. Please note that neither the crash itself, nor the possible causes of the crash, were the, or a decisive consideration in my decision to suspend your AOC. I would have suspended your AOC even if I had been aware of the content of the BASI preliminary report." The Assistant Director did not reveal his reasons for this assertion at that time.

18 Feb 99:
An AAT-directed teleconference is scheduled for 1700, between Uzu counsel, the AAT registrar, and CASA's office of legal counsel, to determine the process of an AAT hearing on the second suspension, and to enable Uzu's counsel to advise CASA of the witnesses Uzu required to examine. Uzu counsel and the AAT were connected. CASA's phone rings out without answering.

19 Feb 99:
CASA office of legal counsel telephones Uzu to advise they had confused the day, thinking the teleconference was set for the following day. Uzu's lawyers indicate that there was no utility in having a telephone conference for a hearing in relation to the first suspension (which is what the telephone conference on 18 February was intended to do) because a second suspension had been issued. Uzu's lawyers indicated that Uzu would now be applying to the AAT for a stay of the second suspension for hearing in the following week. On the same day Uzu Air provides CASA with a detailed 50-page response to the further 28 day suspension of its AOC, detailing the foregoing events and again raising the question of RPT versus charter.

24 Feb 99:
Uzu's lawyers request the AAT issue three subpoenas to involved CASA staff members to attend the hearing the following day. AAT declines due to inadequate time.25

Feb 99:

At a cost of about $10,000, Uzu attend AAT Sydney at 0915. At 0930, AAT Vice President's associates advise that CASA will not be attending, due to commitments in Brisbane, but CASA will not object to a telephone hearing. (CASA claims it had earlier advised Uzu and the AAT it would be unable to attend but would not object to a telephone hearing.) However CASA's counsel objects to any evidence being tendered or any witnesses being called, "on the basis that it is inappropriate for oral evidence to be given at a stay hearing.” Deputy President Chappell rules that oral evidence was not appropriate for that reason. Uzu, which has now not earned any revenue for 36 days, is therefore again denied an opportunity to confront its accusers, some of whom are on "stress leave", a luxury unavailable to Uzu's general manager or his staff, some of whom have been stood down. CASA however successfully objects to the lifting of the suspension on the grounds of "Air Safety," relying on Section 9 of the Civil Aviation Act.

2 Mar 99:
Meeting in Canberra attended by Uzu's chief pilot, an Uzu consultant, CASA's General Manager, Aviation Operations and CASA's public affairs manager. Uzu was told that CASA wouldn't extend the suspension, but would either lift it, or let it run its course until 16 Mar. The company was also told that CASA would not renew the suspension or cancel the AOC. No explanation was offered as to why, having made that decision, CASA would not lift the suspension immediately. It was agreed that draft checking and training and maintenance procedures were required and had been submitted, and that checking and training and progressive maintenance would be progressively incorporated.

5 Mar 99:
AAT teleconference between CASA office of legal counsel, Uzu is advised that the relevant DFOM was reviewing the material on Uzu and had indicated that he would not recommend a cancellation. He indicated that he would consider a recommendation to lift the suspension, but only after reviewing the remainder of the material and speaking with airworthiness officers with respect to manuals. He advised that he would attempt to do so by 10 March at the earliest and 12 March at the latest. He also advised even if such a recommendation was made, it was just that. It would be ultimately a matter for the decision maker in Canberra to accept any recommendation.

8 Mar 99:
CASA acting DFOM Cairns advises he is satisfied with the draft manuals and will be making "unspecified recommendations" to CASA Canberra. Uzu's optimism is heightened.

9 Mar 99:
CASA publishes an amended CAO 82.3 and three blanket exemptions, authorising air charter operators in the Torres Straits to operate RPT without meeting the aerodrome, maintenance, or training and checking requirements for RPT until June 9.CASA's comment: "While the check and training system might have been satisfactory in draft form, the district AW manager was not satisfied with the AW control mechanisms." Uzu is thus denied access to the March 9 amendments to CAO 82.3, and to the exemptions granted to Torres Strait operators.

10 Mar 99:
AM - CASA shifts the goalposts again. While its competitors, who have been operating for the two months Uzu has been grounded, are still in the air and have 90 days to comply with RPT rules, Uzu is told it must comply BEFORE its AOC is restored.
PM - Uzu's solicitor contacts CASA office of legal counsel and is told the manuals the company has submitted are only DRAFT and that Uzu has not nominated a maintenance controller or check and training captain.Australian Flying faxes a draft of this chronology to CASA with an invitation to review it for accuracy.

11 Mar 99:
CASA phones and indicates that a response, detailing some "errors and omissions" will be faxed "tomorrow." Australian Flying admits that because of space limitations it has omitted considerable material, much of it damaging to CASA. (Information provided in CASA's response is incorporated in this narrative.)

12 Mar 99:
The CASA response does not arrive. Or maybe, obliquely, it does. A faxed message from CASA to Uzu suspends the AOC for a third period, "pending an investigation by CASA into your company's operations, and the risk to the safety of air navigation in allowing the AOC to continue in force... The reasons for this decision and the facts and circumstances on which I rely are set out below." The letter details thirty-eight points as "facts and circumstances.”

15 Mar 99:
A fax to the Hon. Warren Entsch, Member for Leichhardt, in response to a phone call to CASA from Mr. Entsch, says that for UZU to have its AOC reinstated, it must comply with three requirements - training and checking, Class A maintenance, and an approved maintenance controller, which UZU has already addressed.

24 Mar 99:
In a pre-hearing teleconference between Uzu, CASA and the AAT, the Tribunal indicates that it expects CASA to restore the AOC by close of business on Mar 26, provided the three CASA conditions are met (which UZU insists they already are). In anticipation of a full AAT hearing the following week, UZU has already applied for summonses requiring CASA personnel to be present at the hearing. This means they will almost certainly be called upon to give evidence and to face cross-examination.

26 Mar 99:
The AAT official indicates that she will be in her office for a further half hour after close of business, and that if the AOC is not restored by that time she will arrange a "substantive" hearing on Monday 29. Late on Friday afternoon, CASA blinks. In a faxed message UZU is advised its charter AOC is restored "subject to the company implementing Class A maintenance” and check and training - a unique requirement, but at least the company is back in business.

General aviation is not one big happy family; but other operators watched the process with keen interest, and even UZU's commercial rivals were horrified at its implications for the rest of the industry. CASA sources now acknowledge: "the matter could have been better handled".

Torres note: Within days of the lifting of the AOC suspension, Uzu Air submitted all documentation for the issue of a Remote Area RPT AOC. The issue of the AOC was stalled some weeks by CASA, Canberra (whilst they reviewed an application for a similar AOC by one of Uzu Air’s competitors), however Uzu Air still received the second such AOC in Australia.

Some years later a retired CASA FOI advised Torres there was an "element of revenge" involved for a totally different and unrelated matter in July 1987 involving CASA.

Last edited by Torres; 15th Aug 2019 at 07:02.
Torres is offline  
Old 15th Aug 2019, 14:32
  #236 (permalink)  
 
Join Date: Mar 2005
Location: America's 51st State
Posts: 291
Received 43 Likes on 16 Posts
Hi Torres. Who was the General Manager of General Aviation Operations at the time?
VH-MLE is offline  
Old 15th Aug 2019, 20:42
  #237 (permalink)  
 
Join Date: Oct 2017
Location: Tent
Posts: 916
Received 19 Likes on 12 Posts
Originally Posted by VH-MLE
Hi Torres. Who was the General Manager of General Aviation Operations at the time?
JF?

Does that position even exist anymore?
Bend alot is offline  
Old 15th Aug 2019, 21:09
  #238 (permalink)  
 
Join Date: Jul 2010
Location: sydney
Posts: 1,469
Likes: 0
Received 0 Likes on 0 Posts
The only good light Paul's report shines on is the integrity of BASI.

I imagine if the crash had been investigated by CAsA's bastard child
in todays world the ATSB no doubt would have come to totally different
conclusions to suit CAsA's narrative rather than the truth.
What an unconscionable state we have allowed our bureaucrats to descend into.
thorn bird is offline  
Old 15th Aug 2019, 21:49
  #239 (permalink)  
 
Join Date: Mar 2000
Location: Canberra ACT Australia
Posts: 720
Received 245 Likes on 124 Posts
Originally Posted by VH-MLE
Hi Torres. Who was the General Manager of General Aviation Operations at the time?
Me.

I always despair that legitimate grievances are not distilled into the real issues.

UZU and others were conducting RPT without RPT AOCs. That was against the law. The AAT agreed with CASA’s interpretation and its application to the facts.

In my view the legitimate grievance was, and continues to be, that the classification of operations rules have been diarrhoea for decades. UZU and others were the victim of the muddy messes that are the definitions of RPT and Charter - precisely the issue that Commissioner Staunton identified in 1996 as requiring “urgent” review. (That’s not a typo. That’s nineteen ninety six.)

I know it will be cold comfort for you, Torres, but I was the subject of more internal criticism than external about the regulatory action that was taken. The basis of the internal criticism was that the classification of operations rules were “just about to change”. CAR 206 was going to “reformed” “soon”. But that was bull****, as has been demonstrated by the ensuing 20 plus years. The remote island AOC concept just put another hump on the classification of operations camel - yet more complexity in an already-complex and confusing classifications system.

By 1999 the regulatory ‘reform’ program had become, in my view, an ongoing expensive hoax on the industry and the taxpayer. The 20 years of ‘reform’ following my departure from CASA have not altered my view. (That’s not a typo. That’s twenty years.)

I’m sure CASA will get around to ‘reforming’ classification of operations ‘soon’. However, I doubt whether the product will be clear or concise or welcomed by industry.

But I could be making it all up and it could all be my fault. Feel free to blame me if it makes you feel better.
Clinton McKenzie is offline  
Old 15th Aug 2019, 23:36
  #240 (permalink)  
 
Join Date: Aug 2004
Location: moon
Posts: 3,564
Received 89 Likes on 32 Posts
Spoke to a former very senior ministerial advisor (not transport minister) last night and explained, as best I could, my opinion of what “the problem” is. In essence, the CASA game is to talk legislation and regulation BS to the aviation community but when talking to their bosses, they switch and talk technical aviation BS. They calculate, correctly, that neither group has the ability to see through the particular fog that CASA is emitting at them. They threaten us both with different things and it works.

Unfortunately the advisors opinion is that CASA can successfully do this almost indefinitely. A fatal regional jet accident isn’t big enough to stop them either. Only a catastrophic accident or the potential for electoral disaster will get the politicians talking to the aviation community and galvanised enough to make the effort to understand and force radical reform.

To be fair to CASA, I would have employed the same strategy if I were in the chair and convinced myself it was best for Australia that way.

Pilots and Engineers haven’t helped themselves over the years either. Too many egos get in the way and divide and rule is a very effective tactic.

As for Qantas and the RAAF, they couldn’t care less. CASA can’t touch them.
Sunfish is offline  