Proposed Tulla Upgrade
Thread Starter
Join Date: Apr 2008
Location: Oz
Posts: 104
Likes: 0
Received 0 Likes
on
0 Posts
Proposed Tulla Upgrade
OK, OK, it does sound like a long shot, but a gent I spoke to tonight swears that there will be a whole new terminal facility built at and around the vicinty of the QF maint base - not sure if it will be stand alone or connected to the existing terminal structure.
Time line to be within the next 5 years
It may also explain the decision to close the Heavy Maint facilty.........
Time line to be within the next 5 years
It may also explain the decision to close the Heavy Maint facilty.........
Join Date: Mar 2007
Location: Sydney
Posts: 137
Likes: 0
Received 0 Likes
on
0 Posts
CRAP.
Here is the Master Plan that they are required to publish as a condition of the government licence to operate the airport.
Some other interesting developments coming that affect the other maintenance hangars though.
See here: http://melbourneairport.com.au/docs/...08--part-a.pdf
MP
Here is the Master Plan that they are required to publish as a condition of the government licence to operate the airport.
Some other interesting developments coming that affect the other maintenance hangars though.
See here: http://melbourneairport.com.au/docs/...08--part-a.pdf
MP
Last edited by Managers Perspective; 28th Jul 2012 at 07:27.
Join Date: Nov 2007
Location: australia
Posts: 168
Likes: 0
Received 0 Likes
on
0 Posts
Having seen Melbourne grow over the past 40 years, my suggestion would be to start again.
There not enough gates, the freight apron is being used to as a domestic terminal and aircraft holding off gates at peak times in the morning is disgraceful.
By the plan it appears the Virgin hangar complex becomes a freight apron.
There not enough gates, the freight apron is being used to as a domestic terminal and aircraft holding off gates at peak times in the morning is disgraceful.
By the plan it appears the Virgin hangar complex becomes a freight apron.
I had the misfortune to arrive at Melbourne's international terminal early one morning last week. I have to say it was the worst I have experienced anywhere. The CIQ facilities were totally inadequate to cope with the number of arriving passengers and crew, resulting in very long queues and more than a few frayed tempers. The arrival hall is very rundown and in dire need of a makeover.
What a way to welcome visitors to our country. Honestly, there are so-called third world countries that have far better airports than Australia.
What a way to welcome visitors to our country. Honestly, there are so-called third world countries that have far better airports than Australia.
Yes, its a disgrace.
Passengers having flown for up to 20hrs then having to wait for up to 40 minutes on the taxiway because "their gate is occupied.
The proposed expansion only assists domestic passengers. There is no planned growth in the Shopping Centre (some call that space the International Terminal).
Passengers having flown for up to 20hrs then having to wait for up to 40 minutes on the taxiway because "their gate is occupied.
The proposed expansion only assists domestic passengers. There is no planned growth in the Shopping Centre (some call that space the International Terminal).
Join Date: Aug 2009
Location: Lisbon
Posts: 995
Likes: 0
Received 0 Likes
on
0 Posts
TSV refueller, does he know?
a gent I spoke to tonight swears that there will be a whole new terminal facility built at and around the vicinty of the QF maint base