LL Operational Requirements
As I understand it operations start from the new Control Tower at Heathrow on the 13th Jan 2007. (Correct me if I'm mistaken)
I gather EFPS will be in operation in the new tower as well. Are there going to be any further operational requirements in terms of the number of ATCO's required in the tower at any one time? Cheers, SHT6Y |
Originally Posted by ShuttleSixYankee
(Post 3024610)
As I understand it operations start from the new Control Tower at Heathrow on the 13th Jan 2007. (Correct me if I'm mistaken)
I gather EFPS will be in operation in the new tower as well. Are there going to be any further operational requirements in terms of the number of ATCO's required in the tower at any one time? Cheers, SHT6Y Seems like they hope to have it on line before Terminal 5 in 2008. No other exact date has been set. |
operations start from the new Control Tower at Heathrow on the 13th Jan 2007
Wishful thinking...:oh: |
not enough controllers are likely to have completed their training Coat on, walking out of the door.............. |
Coat on, walking out of the door.............. |