Gonzo 29th Nov 2019 19:14

Now now, WWW, you know that we don’t do facts here! :cool:

whowhenwhy 29th Nov 2019 21:20

Sorry, what was I thinking. Have had a stern word with myself. Normal service will be resumed soon.

callum91 30th Nov 2019 17:06

Sure if it’s a quiet period you can arguably stay plugged in for longer without suffering fatigue (which straight away reduces the minimum OR) but what about comfort breaks when you’re the only ATCO on duty valid on that position?

2 sheds 1st Dec 2019 10:18


SRATCOH was designed to deal with the Heathrows of this world
With respect, I don't think that is accurate. It was/is probably needed just as much, if not more so, at other units.

2 s

alfaman 1st Dec 2019 11:16


Originally Posted by 2 sheds (Post 10630197)
With respect, I don't think that is accurate. It was/is probably needed just as much, if not more so, at other units.

2 s

I agree - when I started, we worked the old 4 watch "A-M/N-S-O" system, which was very fatiguing as traffic changed (as busy at night as during the day). Without regulation of hours, I doubt very much that would have changed, the airport management would have seen it as a cost at a time when money was tight enough anyway. The CAA units, as it was, were already working to what became the norm anyway.

2 sheds 1st Dec 2019 11:27


we worked the old 4 watch "A-M/N-S-O" system, which was very fatiguing
Or to put it another way, b***** criminal!

2 s

Brian 48nav 1st Dec 2019 15:24

whowhenwhy

Please excuse a retired old git coming in on this again! I'm with 2sheds, Scratcoh was NOT brought in for Heathrow - I have no recollection of it being discussed there until it was implemented. As I said above I think a couple of airfields, maybe Roborough and Lands End ( I could be wrong here ) were having staffing difficulties, hence long hours for the validated controller/s. One of the main men in GATCO at that time was one of my colleagues at Heathrow and being an erudite chap he was probably involved in the discussions with SRG or whoever.

We worked MMAANN/various DAY duties with the old D1 starting at 0800, 10 hours after the end of the A shift ( if you didn't get an EG ) - I think most people were happy with that particularly as your 4 days off ran together and even started early with a 1430/1500 finish on the last day of six. I don't think many people liked having a day off between the second A and the D1.

Maybe Talkdown Man and Heathrow Director remember more?

Talkdownman 1st Dec 2019 22:55


Originally Posted by Brian 48nav (Post 10630352)
Maybe Talkdown Man and Heathrow Director remember more?

I remember you.

Frank


ISTR that when LATCC went on to the AAOMMNNSOO, Heathrow went straight on to the MMAANNSOOO. Not sure Heathrow ever did the former. I think there was a day off between the second Afternoon and the D1s because they weren't separated, MMAAOD1D1OOO. Hated nights, hated D1s, I was a 'late days' man, nearly always got them...probably because I did the rostering...well, nobody else seemed to want them! Could do a lot before a 1600 start. Used to do about three hours flight instruction before a D4 or D5...until the secondary employment restrictions were introduced.

whowhenwhy 4th Dec 2019 16:10

Brian48 Nav et al, apologies if I have it wrong about LHR being the origins of SRATCOH, I can only go off what I was told. The rest of what I mentioned though is gen

spekesoftly 4th Dec 2019 17:07

There's some background information on the development of SRATCOH in the following link:-

https://atchistory.wordpress.com/201...ng-paper-1977/