davys747
14th Aug 2010, 05:37
I was wondering if anybody could shed some light on the following.
There does not appear to be a published SID (graphical or otherwise), published evaluated climb sector or written departure procedure for FIMP. I have looked through the AIP and all I can find is the 25NM MSA's.
Given there is H24 ATC, does this mean that the route clearance will include any terrain clearance requirements, if necessary?
Is there something else I have missed?
There does not appear to be a published SID (graphical or otherwise), published evaluated climb sector or written departure procedure for FIMP. I have looked through the AIP and all I can find is the 25NM MSA's.
Given there is H24 ATC, does this mean that the route clearance will include any terrain clearance requirements, if necessary?
Is there something else I have missed?