24th Dec 2007, 10:09
Compliments of tis Seasons, Mates !!!

I've a query :

Previously when we have a total SATCOM inop,(LGA and HGA)
we wud change RNP4 to 10 and delete S frm DAT/VM in item 18 of ICAO
ATC plan.Further CPDLC function is deemed disabled due total SATCOM
inop,which also meant deletion of J frm item 10

Then I was told even with SATCOM LGA/HGA failure, CPDLC function is possible using VHF as a carrier.

Can anyone please enlighten me ?
Pls tell me what is yr Company procedure when you have total SATCOM
(LGA/HGA/) failure with regards to filing ICAO ATC plan
PM me if you want confidentiality

Best Regards

The OC

SI LGA/HGA Low Gain Antenna/High Gain Antenna

OpsControl
29th Dec 2007, 09:10
Thanks for all yr valuable feedback and inputs
To wrap up let me share my findings and draw a conclusion:
Total SATCOM failure means CPDLC is degraded
ICAO ATC plan Item 10 Equipment calls for J deletion
ICAO ATC plan Item 18 Other Info: RNP is downgraded to 10
DAT has S deleted
Thanks for all yr help
The OC
SI Even with SATCOM inop CPDLC operated on VDL is limited by range
and de-facto non-functional