dwlpl
16th Jan 2004, 00:39
With the next phase of terminal expansion at Liverpool due to open next month, the airport has turned to the following phase.
The current terminal has a planning ceiling of 4.5million passengers. The airport expects to reach that figure before the end of 2005.
The airport is now planning to either build another extension to the terminal or build a NEW one.
The new terminal, according to reports, may be built on land near to the new control tower on the opposite side of the runway from the current terminal.
Planning proposals are to be lodged with Liverpool City Council later this year.
The current terminal has a planning ceiling of 4.5million passengers. The airport expects to reach that figure before the end of 2005.
The airport is now planning to either build another extension to the terminal or build a NEW one.
The new terminal, according to reports, may be built on land near to the new control tower on the opposite side of the runway from the current terminal.
Planning proposals are to be lodged with Liverpool City Council later this year.