Wikiposts
Search
Airlines, Airports & Routes Topics about airports, routes and airline business.

Southend-2

Thread Tools
 
Search this Thread
 
Old 6th Apr 2019, 06:53
  #2761 (permalink)  
 
Join Date: Oct 2006
Location: southern spain
Posts: 1,986
Likes: 0
Received 0 Likes on 0 Posts
No Dave your health is everything, believe me. Some late night arrivals tonight and no trains to London, not ideal by any means.
compton3bravo is offline  
Old 6th Apr 2019, 07:46
  #2762 (permalink)  
 
Join Date: Jul 2006
Location: UK
Age: 75
Posts: 2,694
Received 0 Likes on 0 Posts
Originally Posted by compton3bravo
No Dave your health is everything, believe me. Some late night arrivals tonight and no trains to London, not ideal by any means.
You are correct on both counts. The bespoke taxi service available seems able to cater, so far, for the numbers of pax missing the last train, although at £27.50 to Liverpool Street it's obviously not ideal. Apparently some train drivers at Ilford are being rostered onto 'airport duties' in the near future so whether that might mean earlier and later trains from May I don't know.
Expressflight is offline  
Old 7th Apr 2019, 20:30
  #2763 (permalink)  
 
Join Date: Jan 2015
Location: Milton Keynes
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
So as promised - Tried the Approach on RW27 at EGLC in the 737-800 simulator and lets just say we made it in but it weren't pretty! PM was calling unstable most of the way down the approach!! I think our VSI was around -1200ft or more, Flap 40 and Airspeed sat around 119kts!! Tanks were a tad over a tonne, I'll keep trying with some legal amounts but don't fancy my chances :-)
PLAMALTN is offline  
Old 7th Apr 2019, 22:39
  #2764 (permalink)  
 
Join Date: Apr 2012
Location: ESSEX
Posts: 274
Likes: 0
Received 0 Likes on 0 Posts
Careful. I’d hate for you to knock my old office over.. er or not
SARF is offline  
Old 8th Apr 2019, 07:42
  #2765 (permalink)  
 
Join Date: Feb 2008
Location: UK
Age: 66
Posts: 841
Received 41 Likes on 21 Posts
Originally Posted by PLAMALTN
So as promised - Tried the Approach on RW27 at EGLC in the 737-800 simulator and lets just say we made it in but it weren't pretty! PM was calling unstable most of the way down the approach!! I think our VSI was around -1200ft or more, Flap 40 and Airspeed sat around 119kts!! Tanks were a tad over a tonne, I'll keep trying with some legal amounts but don't fancy my chances :-)
I read some Boeing blurb that a 737NG could be offered for LCY ops - I do think they were meaning the 737-700 with SFP not the 738

Smartwings land their 737-700's at Paros Island with payload restricted to 120 pax
rog747 is offline  
Old 8th Apr 2019, 12:19
  #2766 (permalink)  
 
Join Date: Jul 2006
Location: UK
Age: 75
Posts: 2,694
Received 0 Likes on 0 Posts
Rumours seem to be growing that early and late trains on the Liverpool Street line might soon be introduced. The latest report suggests that these would terminate/originate at SEN and operate with limited stops from/to Liverpool Street.
Expressflight is offline  
Old 8th Apr 2019, 12:58
  #2767 (permalink)  
 
Join Date: Jun 2011
Location: essex
Posts: 595
Likes: 0
Received 0 Likes on 0 Posts
reports from another forum has said that SEN has a notified RFF CAT 7 what ever that means(answers in plain English please)
mikkie4 is offline  
Old 8th Apr 2019, 13:11
  #2768 (permalink)  
 
Join Date: Jan 2014
Location: Daws Heath Essex
Posts: 446
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by mikkie4
reports from another forum has said that SEN has a notified RFF CAT 7 what ever that means(answers in plain English please)
I hink you will find that refers to Rescue and Fire categories which have been upgraded to meet the B738 requirements.
Planespeaking is offline  
Old 8th Apr 2019, 14:03
  #2769 (permalink)  
 
Join Date: Jan 2008
Location: Luxembourg
Posts: 791
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Planespeaking


I hink you will find that refers to Rescue and Fire categories which have been upgraded to meet the B738 requirements.
Correct sir!
tophat27dt is offline  
Old 8th Apr 2019, 21:52
  #2770 (permalink)  
 
Join Date: Apr 2016
Location: Essex
Posts: 1,226
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Expressflight
Rumours seem to be growing that early and late trains on the Liverpool Street line might soon be introduced. The latest report suggests that these would terminate/originate at SEN and operate with limited stops from/to Liverpool Street.

Can't happen. No crossover for the train. Could put one in or build a bay road (3rd platform), but that's not something that can be done overnight. Early trains to London are more than adequate, but there's nothing to hope for other than 1 additional train in the evening. There's an army of workers waiting to access the track every night after the last train, and every train has to be prepared for the next day's service.
DC3 Dave is online now  
Old 9th Apr 2019, 06:00
  #2771 (permalink)  
 
Join Date: May 2014
Location: Westcliff-on-Sea
Age: 78
Posts: 300
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by DC3 Dave
Can't happen. No crossover for the train. Could put one in or build a bay road (3rd platform), but that's not something that can be done overnight. Early trains to London are more than adequate, but there's nothing to hope for other than 1 additional train in the evening. There's an army of workers waiting to access the track every night after the last train, and every train has to be prepared for the next day's service.
Could be done. Not aware of where the nearest crossover is in the London direction but the whole line is signalled for single line working so it would not be too far away or single track working would be nigh on impossible After the last SOV train has run single line working could be employed from SEN to the first crossover. There wouldn't be too may trains to allow for this. As far as engineering possession goes, this may have to be shortened by an hour and a half or so each night; if this happens with this delay that means the last train could be at about 00:30. I have never worked on the railway so perhaps I'm talking rubbish. Just my thoughts on the subject.
SEN Observer is offline  
Old 9th Apr 2019, 06:12
  #2772 (permalink)  
 
Join Date: Aug 2014
Location: Outer London
Age: 43
Posts: 604
Likes: 0
Received 0 Likes on 0 Posts
I doubt very much they work on either of the two lines every single night of the week, let alone both of them. The GA mainline for example has freight running through the night to/from Stratford jct. Therefore it would be possible to run a later/earlier train in either direction. It’s more likely an issue with staff contracts or some weird railway bureaucracy, although if it were such a thing they overcame it during the Olympics.
AirportPlanner1 is online now  
Old 9th Apr 2019, 07:30
  #2773 (permalink)  
 
Join Date: Mar 2003
Location: Europe
Posts: 2,175
Likes: 0
Received 0 Likes on 0 Posts
Why can't they simply let the train continue to Victoria just two stations down the line (and in doing so, have some more punters going to/from Southend onboard)?
virginblue is offline  
Old 9th Apr 2019, 09:08
  #2774 (permalink)  
 
Join Date: May 2014
Location: Westcliff-on-Sea
Age: 78
Posts: 300
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by virginblue
Why can't they simply let the train continue to Victoria just two stations down the line (and in doing so, have some more punters going to/from Southend onboard)?
Depends on what limited stops means. If it was only going to stop at, say, Shenfield, Romford and Stratford on the way then there would probably not be enough at Southend Vic to warrant it. Also perhaps rowdy club goers on their way home wouldn't be welcome on what is intended to be an airport train, throwing up on foreign visitors for instance. If it does come about, and starts it's journey at SEN, then there must be some reason behind the decision. Part funded by Stobart??






SEN Observer is offline  
Old 9th Apr 2019, 10:21
  #2775 (permalink)  
 
Join Date: Sep 2008
Location: Blighty
Posts: 5,675
Likes: 0
Received 22 Likes on 17 Posts
I'm possibly being a bit thick, but what is there against the airport providing a subsidy to National Express or another coach company for early morning / late night ? It solves all the problems of rail engineering works, and means rather than one single train service with 300+ seats (and potentially a very long wait between services) you can instead have coaches spaced at regular intervals. Maybe set up some revenue sharing scheme so coach and train have interchangeable tickets. If these coaches can show up in the national rail timetable this would encourage potential passengers

Stansted had far more pax per year than Southend does before early morning / late night trains were introduced. I really think that some sort of interim and lower cost scheme is needed to ensure demand can be proven further to all the relevant stakeholders in a train service
davidjohnson6 is offline  
Old 9th Apr 2019, 10:44
  #2776 (permalink)  
 
Join Date: May 2014
Location: Westcliff-on-Sea
Age: 78
Posts: 300
Likes: 0
Received 0 Likes on 0 Posts
National Express tried a late coach a couple of years or so ago. It only lasted a few months.
SEN Observer is offline  
Old 9th Apr 2019, 10:46
  #2777 (permalink)  
 
Join Date: Aug 2014
Location: Outer London
Age: 43
Posts: 604
Likes: 0
Received 0 Likes on 0 Posts
They got National Express signed up a while back, sadly it was launched during the winter when there were few flights and even fewer that needed late/early buses. It didn’t last long. It probably would now be more viable.
AirportPlanner1 is online now  
Old 9th Apr 2019, 11:03
  #2778 (permalink)  
 
Join Date: Apr 2016
Location: Essex
Posts: 1,226
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Expressflight
The nearest crossover is just east of Hockley Station, about 5km from SEN, so that seems feasible for such a plan. The last London-bound train leaves Hockley at 23.12.
They will not wrong road a train that distance with Southend bound trains still on the down.

​​​​​​Anyway, the timetable changes in May and the last London bound train remains 23:05. Timetables are planned a year or so in advance, so the next revision - Dec 2019 - will be more or less set in stone by now.

If the train operator could get away with it they would simply run trains to London in the morning and back to Southend in the evening peak. They are contractually required to run an off-peak service, it's the only reason they do so.

The only way Southend Airport will get late night services to London is if it becomes a contractual requirement when the franchise comes up for renewal.

DJ is right. A coach service is required, I am surprised no one has come forward given the increased in pax
numbers.
DC3 Dave is online now  
Old 9th Apr 2019, 13:52
  #2779 (permalink)  
 
Join Date: Aug 2008
Location: bishops stortford herts
Posts: 0
Likes: 0
Received 0 Likes on 0 Posts
"Hundreds of passengers stranded" last night with 8 flights diverting away due fog according to the Echo then.
southside bobby is offline  
Old 9th Apr 2019, 14:52
  #2780 (permalink)  
 
Join Date: Jul 2006
Location: UK
Age: 75
Posts: 2,694
Received 0 Likes on 0 Posts
Originally Posted by SEN Observer
National Express tried a late coach a couple of years or so ago. It only lasted a few months.
It was very badly promoted and started in the low season. I eventually found the timetable at the Moneycorp desk in the check-in hall which is about the last place one would expect. Stobart decided they didn't want it costing them £20,000 per month for so little return and it was pulled.

There is currently a Andrews Taxi/Southend Airport joint experimental coach service from SEN to Upminster Tube station, apparently running hourly from 09.15 to 22.30 each day at a cost of £10. This is mentioned on the SEN website only in the 'Rail Replacement' notice so people thinking of using a coach during the day are unlikely to find out about it. Oh, and you can only get further information about it "from the Taxi Marshal" - very helpful if you wanted to book in advance. Not very impressive.
Expressflight is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.